Similar Projects
Steele Street Pump Station Upgrades - City of New Britain
New Construction, Infrastructure
Conception
$450,000 est. value
New Britain, CT 06052

Whites Bridge Pond Station Improvements - City of New Britain
Renovation
Conception
$6,000,000 est. value
New Britain, CT

Route 44 Sanitary Sewer Pump Station Rehabilitation - Town of Avon
Infrastructure
Design
$700,000 CJ est. value
Avon, CT 06001

Water Main Interconnection Project
Infrastructure
Design
$500,000 CJ est. value
Ridgefield, CT 06877

Old Norwich Road Sewer Pump Station Upgrades
Renovation, Infrastructure
Bidding
$3,489,843 CJ est. value
Waterford, CT 06375

RFQ Engineering - Drinking Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
New Britain, CT 06051

Vault B6 Pump Station
Infrastructure
Post-Bid
$326,777 CJ est. value
Storrs Mansfield, CT 06269

Goodwin Park Irrigation and Booster Pump Improvements
Infrastructure
Post-Bid
$1,450,000 CJ est. value
Hartford, CT 06114

Wet Well Ventilation Upgrades for Gravel Street Pump Station
Results
Mystic, CT 06355

Quinebaug Valley Hatchery Energy and Water Supply System Operating Improvements
Renovation
Results
$2,979,587 to $3,293,228 est. value
Plainfield, CT 06374

Water Pollution Control Facility Service Building Replacement
Demolition, New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Waterbury, CT 06708

Wastewater Pump Stations Rehabilitation Project
Renovation
Pending Verification
$3,494,950 CJ est. value
Southington, CT 06489

Killingly WPCA Building Improvement Project
Renovation
Pending Verification
$200,000 CJ est. value
Killingly, CT 06239

Old Norwich PS (Station Rehab) - Town of Waterford
Renovation
Conception
$400,000 CJ est. value
Quaker Hill, CT 06375

Route 44 Pump Station Upgrade
Renovation, Infrastructure
Bidding
$2,500,000 CJ est. value
Avon, CT 06070

Last Updated 07/25/2023 03:31 PM
Project Title

Mission Communications Monitoring System

Physical Address View project details and contacts
City, State (County) Plainfield, CT 06374   (Windham County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $622,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The Mission Communications Monitoring System Project consists of removal and disposal of existing phone dialer alarm systems and the installation of Mission Communications Monitoring System at twelve (12) pump stations and two (2) treatment plants in the Town of Plainfield The Project has an expected duration of 365 days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents