Similar Projects
Road Surfacing - Phase II
Post-Bid
Edgewood, NM

Paving IDIQ
Post-Bid
Less than $10,000,000 est. value
Clovis, NM 88101

Camelot Boulevard Extension
Results
Less than $1,013,917 est. value
Los Lunas, NM

Core Area Street and Infrastructure Improvements Phase 1
Results
Angel Fire, NM

Construction of the Dipaolo Hill Drive and Wood Lane Improvements
Post-Bid
Ruidoso Downs, NM

Veteran's National Cemetery Road Construction
Results
Gallup, NM

Roadway Reconstruction and Improvements Phase II
Post-Bid
Less than $63,000 est. value
Sunland Park, NM

2019 Annual Maintenance Contract
Results
Roswell, NM

Gap Road (2.3 Miles)
Post-Bid
Mosquero, NM

Construction of the 7th Street Reconstruction Phase II
Results
$5,500,000 est. value
Clovis, NM

2018-2019 Pavement Replacement
Post-Bid
Las Cruces, NM

Hermosa Drive Reconstruction 13th Street to 26th Street
Results
$5,600,000 est. value
Artesia, NM

West Warrior Drive Road Repair Improvement Project
Post-Bid
Ruidoso, NM

NM Flap 100(1) Soledad Canyon Road
Results
$7,000,000 to $9,000,000 est. value
Las Cruces, NM 88011

Reconstruct Approximately 0.974 Miles of L26 Rainfall Road
Post-Bid
Laguna, NM

Reported 02/13/2019 10:43 AM
Project Title

Paradise Boulevard Improvements (Golf Course Road to Eagle Ranch Road)

Physical Address View project details and contacts
City, State (County) Albuquerque, NM   (Bernalillo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method
Project Status Construction Commenced March 2019
Bids Due View project details and contacts
Estimated Value Less than $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Widen Paradise Blvd. from Golf Course Rd. to Eagle Ranch Rd. based on the 2040 Long-Range Metropolitan Transportation Plan, to include two driving lanes for eastbound and westbound traffic, raised medians, left-turn lanes, right-turn lanes and curb and gutter, valley gutters, concrete sidewalks, ADA access ramps and a 12 wide asphalt trail on the south side of Paradise. Improvements also include asphalt microsurfacing the full width of Paradise from Golf Course to Eagle Ranch, traffic signs and pavements markings, traffic signal modifications ITS modifications, roadway lighting, storm drain modifications, and water line relocations and modifications.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents