Similar Projects
Claremont Pump Station Stair Replacement - NS OPs
Bidding
Hampton, VA 23661

Walkway Replacement -Landing Replacement -Deck Replacement
New Construction
Bidding
Roseland, VA 22967

Rhoads Hall - Limited Facade Repairs - South and East Elevations
Post-Bid
Richmond, VA

Furnish and Install Retractable Awning at Maze Hall
Post-Bid
Petersburg, VA 23805

Eagle, Globe and Anchor Installation
Results
Yorktown, VA 23691

Construct Fountain in Trible Plaza
Results
$550,000 est. value
Newport News, VA 23606

VSDB Main Hall Exterior Renovation
Renovation - 49,283 SF
Bidding
Staunton, VA

Repair Exterior and Repaint Building
Post-Bid
Richmond, VA 23220

York Hall Cupola Repairs
Results
$13,444 to $89,000 est. value
Yorktown, VA 23690

Brick Facade Repair - Walker Building at Tidewater Community College
Bidding
Norfolk, VA

Jessup House Exterior Improvements
Post-Bid
Charlottesville, VA 22903

7th and Marshall Parking Deck Stairs Repairs
Results
Richmond, VA

Interior and Exterior Maintenance Facilities Support Services
Post-Bid
Fort Belvoir, VA 22060

Rosenwald Gym Weatherproof Wall Coating
Results
$78,980 est. value
Waynesboro, VA 22980

Circuit Court Roof and Cupola Repairs
Post-Bid
Charlottesville, VA

Last Updated 11/13/2019 03:55 PM
Project Title

Z--652-17-930 Loading Dock Ramp & Canopy (Construction)

Physical Address View project details and contacts
City, State (County) Hampton, VA 23667   (Hampton City County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Build a ramp and canopy cover from loading dock B . The ramp will be reinforced with both ¼ rebar and welded wire fabric with a 4000 psi. concrete mix. The picket on picket fence wall will be constructed of 3 aluminum square tubing for the fence base, the fence wall will be 1 x6 aluminum fastened to the base. The sloped canopy will have dusk to dawn LED vaper proof lights and will be fastened to both building 500 and the fence wall. Contractor will protect the existing drain by constructing a chase over the drain extending under the proposed ramp. Work to be completed in accordance with local building codes.

Details

Division 05 - Metals, Tension Rod and Cable Truss Assemblies, Canopy Support Truss Assemblies.
Division 09 - Finishes.
Division 11 - Equipment, Loading Dock Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents