Similar Projects
Factory Powersports
New Construction
Conception
Saint George, UT 84770

Extra Space Storage
New Construction - 1,350 SF
Conception
Payson, UT 84651

Fortress Self-Storage
New Construction
Design
Tooele, UT 84074

Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

Design Build Services for Receiving Center Building
New Construction
Bidding
Saint George, UT

Construction Manager/General Contractor for the Public Work Renovation and Vehicle Storage Facility
Renovation
Bidding
$3,720,000 est. value
Coalville, UT 84017

BDO 1140 West - Building G
New Construction - 237,548 SF
Sub-Bidding
$10,000,000 CJ est. value
Ogden, UT

Golden Spike Event Center Pole Barn Structures (3)
Post-Bid
Ogden, UT 84404

AMXG Aircraft Facilitate Other Maintenance (FOM) for Hill AFB
Post-Bid
Ogden, UT

Pre-Engineered Metal Building
Results
Saint George, UT 84770

Two Pre-Engineered Metal Buildings
Results
Less than $150,000 est. value
Saint George, UT 84770

Elite Energy Solutions
Addition - 7,000 SF
Construction
Lindon, UT 84404

Costco Dry Depot Additon #594
Addition - 56,700 SF
Construction
$4,300,000 est. value
Salt Lake City, UT 84104

D & D Commercial
New Construction
Pending Verification
Saint George, UT

Westfield Subdivision Commercial
New Construction - 10,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Logan, UT 84321

Reported 04/30/2021 04:53 PM
Project Title

Cambridge Circle Warehouse

Physical Address View project details and contacts
City, State (County) Layton, UT 84040   (Davis County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Building in Operation as of April 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new ground up 11,947 square foot warehouse building with mezzanine in Layton, Utah.

Details

1 Warehouse/Storage, 11,947 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents