Similar Projects
Last Updated | 02/26/2021 11:23 AM |
Project Title | Berwyn Police Department Fire Pump Controller Replacement |
Physical Address | View project details and contacts |
City, State (County) | Berwyn, IL 60402 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To remove and replace the fire pump controller in the Berwyn Police Department. Scope includes but is not limited to the following: Disconnect existing power and controls from the fire pump controller. Remove existing feeders back to the source. Disconnect fire alarm connection to fire pump controller. Remove conduit and conductors from existing controller to fire pump. Disconnect fire pump controller system pressure sensing line and drain line from fire pump controller. Provide and install new fire pump controller. Reconnect fire alarm system to new fire pump controller. Provide new conduit and conductors to fire pump. Modify as necessary and reconnect pressure sensing line and drain line |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |