Similar Projects
Last Updated | 01/04/2023 10:14 AM |
Project Title | Legacy Project - Phase 2 Multiple School Buildings - Contract No. 16 - Plumbing Construction |
Physical Address | View project details and contacts |
City, State (County) | Saratoga Springs, NY 12866 (Saratoga County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $708,100 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 4, 2023, the project has been awarded and construction is slated to begin in April, 2023. PN-2017049.02, 20116 SED NUMBER : 52-18-00-01-0-014-020 SED NUMBER : 52-18-00-01-5-050-006 Any bid may be withdrawn without prejudice prior to the official bid opening time or any publicized postponement thereof. Any bid received after the time and date stated above will be returned to the bidder unopened. This can be done any Monday through Friday, except holidays, during hours when there will be School District Staff Personnel in the building. Unless directed otherwise, immediately upon entering the building, report to the School Office. This page of the specification may be used to identify you as a bidder. Follow instructions of School Personnel and keep interruptions to teaching activities to a minimum. The bidding documents may be examined, free of charge, at the office of Mosaic Associates Architects, The Frear Building, 2 Third Street, Suite 440, Troy, New York 12180, telephone (518) 479-4000. Checks or money orders shall be made payable to Saratoga Springs City School District. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. The deposit will be refunded ONLY to those bidders who submit a bona fide bid proposal in accordance with the terms in the "Information for Bidders" and who return a complete set of Bidding Documents in COMPLETE, UNMARKED, and NOT TORN condition to REV within thirty (30) days after the award of contract(s) covered by such Bidding Documents, or the rejection of such bid(s). Non-bidders, including material suppliers and subcontractors, as well as plan holders who do not submit bid proposals, WILL NOT be eligible for a refund. Note: REVplans (mosaicaaplanroom.com) is the designated location and means for distributing and obtaining all bid package information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. REVplans takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. Addenda: All bid addenda will be transmitted to registered plan holders via email and will be available at mosaicaaplanroom.com. Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Each Bidder shall prepare their bid proposal, along with a bid security, in accordance with the terms and subject to the conditions set forth in the "Information for Bidders". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and the minimum wage rates to be paid under the contracts. No bidder may withdraw their bid within 45 days after the date of the actual bid opening. The Board of Education reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after the bid opening. This can be done any Monday through Friday, except holidays, during hours when there will be School District Staff Personnel in the building. Unless directed otherwise, immediately upon entering the building, report to the School Office. This page of the specification may be used to identify you as a bidder. Follow instructions of School Personnel and keep interruptions to teaching activities to a minimum. |
||
Details | 2 Stories Above Grade, 25,655 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |