Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Crandon - Three Lakes, Culvert Replacements; Crandon - Three Lakes, Hiles Culvert Replacements
Infrastructure
Bidding

Crandon - Three Lakes, Culvert Replacements; Crandon - Three Lakes, Hiles Culvert Replacements
Infrastructure
Bidding

Concrete Culverts
Post-Bid
WI

2021 Culvert Pipes
Post-Bid
WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

2022 Street and Utility Improvements
Infrastructure
Bidding
Baraboo, WI

Concrete Box Culverts
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Culvert Pipes
Infrastructure
Bidding
WI

Culverts and Guardrails
Post-Bid
Waukesha, WI

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

2022 Road Rehabilitation
Infrastructure
Bidding
Fitchburg, WI 53593

Culvert Materials
Post-Bid
WI

Reported 03/02/2022 12:00 AM
Project Title

Galvanized Steel Arch Culvert

Physical Address View project details and contacts
City, State (County) WI   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Size: 95 inches wide by 67 inches high by 24 feet long. 2. Galvanized steel. 3. Steel gauge. 4. Other:

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents