Similar Projects
Central Municipal Pool
Renovation, Alteration
Conception
$6,000,000 est. value
Cape Girardeau, MO 63701

Lake of the Woods Recreation Area Improvements - 2143 - City of Columbia
New Construction, Infrastructure, Renovation
Conception
$700,000 CJ est. value
Columbia, MO 65202

Maryland Heights Apartments
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Saint Louis, MO 63146

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Swimming Pool Starting Blocks
Infrastructure
Bidding
$400,000 CJ est. value
Columbia, MO 65203

RFQ D/B - Berkeley Splash Pad
Infrastructure
Bidding
$450,000 CJ est. value
Berkeley, MO 63134

23Rd & Swift Apartments
New Construction - 98,621 SF
Post-Bid
North Kansas City, MO 64116

Sandblasting and Painting the Public Pool
Infrastructure, Alteration
Post-Bid
Lexington, MO

Shaw Park Aquatic Center Pump Room Project
Alteration
Results
Clayton, MO 63105

Refurbishment of Eldon Aquatic Center Swimming Pool
Alteration
Results
Eldon, MO

Vande East Apartments
New Construction
Construction
$80,000,000 est. value
Saint Louis, MO 63110

ERC Mixed-Use Development
New Construction, Infrastructure - 1,000 SF
Pending Verification
$20,500,000 CJ est. value
Wildwood, MO 63040

Levy at Martini Corner Mixed-Use / Kansas City
New Construction, Infrastructure - 190,000 SF
Pending Verification
$35,600,000 CJ est. value
Kansas City, MO 64108

Fashionbilt Lofts
New Construction, Infrastructure - 77,500 SF
Design
$57,000,000 CJ est. value
Kansas City, MO 64105

Pool Facility Structural Pre-Cast Package 1
Infrastructure
Post-Bid
Blue Springs, MO

Last Updated 12/22/2022 11:04 PM
Project Title

RFQ D/B - Central Municipal Pool Renovation

Physical Address View project details and contacts
City, State (County) Cape Girardeau, MO 63701   (Cape Girardeau County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Cape Girardeau Missouri seeks Statements of Qualifications from companies/contractors with expertise in design-build services for renovation of Aquatic Facilities. Respondents must be capable of providing design/build services which comply with all applicable local, state, and federal regulations governing construction of said Aquatic Facilities including all associated agency or agencies permitting such projects. Central Municipal Pool is located at 1920 Whitener Street in the City of Cape Girardeau Missouri. The facility, located on the campus of Cape Central Jr. High School, was constructed in 1979 as a joint project between the City of Cape Girardeau and the Cape Girardeau Public School District. The swimming pool is Olympic-size (25 yards X 50 meters) with a water depth beginning at 3.5 ft. transitioning into a 13 ft. diving well. The pool is equipped with one (3) meter and two (1) meter diving boards. The pool walls are welded stainless steel with a gutter style recirculation system. The pool floor is cast-inplace concrete. The Chemical Delivery System consists of a Becs chemical controller and Stenner chemical pumps. The pool water is treated with liquid sodium hypochlorite and muriatic acid stored on-site in approved chemical storage tanks. The filter/recirculation system includes a gravity fed surge tank with diatomaceous earth filter media. Adjoining the main pool is a 12-15 inch depth 26 ft X 26 ft wading pool that runs off the same filter system as the large pool. The facility is operated year round and is housed by an insulated/inflatable structure during the winter months. The scope of service will involve renovation of the existing swimming pool as approved by applicable local, state, and federal agencies and includes all permits for construction, operation, etc. Proposed components of the renovation will be as follows. The scope of the proposal may be scaled back as the project budget dictates. Remove pool deck and existing stainless steel pool walls and gutters. Review geotechnical survey and evaluation of existing concrete pool floor. Install new pool walls, required plumbing and gutters. The pool walls will adjoin the existing pool basin floor. Backfill pool walls and deck and pour new pool decking with required drains and receptacles for peripheral deck equipment. Install a permanent Sprung style structure enclosure with all required HVAC and dehumidification systems. Install a new pool water heater. Replace existing pool filter system with a high rate sand filter, circulation pump, and new filter system components. Re-locate mechanical room above pool deck grade. Install new deck components to include lifeguard stands, ladders, diving boards, and competitive starting blocks for both 50 meter and 25 yard competitive swimming events. Installation of a competitive timing system Demolition and filling of the existing wading pool. Install new site security lighting. Install all new fencing on facility site. Upgrade all facility electrical. Begin Construction March 2023 Question Deadline 09/01/2022 at 4:00 PM CT The City of Cape Girardeau reserves the right to seek clarification or information submitted in response to this RFQ and/or request additional information during the evaluation process. The City of Cape Girardeau will not be liable in any way for any costs incurred by respondents to this RFQ or any part of the procurement process. The selected team will be required to conform to the Missouri Prevailing Wage Law. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents