Similar Projects
Environmental Monitoring Services
Post-Bid
Columbus, GA 31902

Landfill Earthen Material Services Annual Contract
Term Contract
Post-Bid
Jonesboro, GA 30236

Deans Bridge Road MSW Landfill 2020 Phase IIC Closure and Phase III Partial Closure
Results
Augusta, GA 30901

Water Clarifying Unit - Hall County Landfill
Results
Gainesville, GA 30501

New Transfer Station
New Construction
Construction
Less than $2,635,000 est. value
Alpharetta, GA

Repair Plan for The Highway 49 North 3 Landfill
Post-Bid
GA

Replacement Candlestick Flare Station (CSFS)
Results
Albany, GA 31702

Phase I (MSW) - Waste Mining and Phase III (C&D) - Cell Nos. 9 & 10
Post-Bid
Thomasville, GA

Landfill Scale
Results
Less than $82,000 est. value
Claxton, GA 30417

SR 247 MSW Landfill Phase 6 Stage 1B Construction
Post-Bid
Kathleen, GA 31047

Landfill Scale House
Results
Less than $40,000 est. value
Claxton, GA

Construction of Compost Area at Old Macon Road Landfill
Post-Bid
Dublin, GA 31040

Environmental Monitoring - Post Closure Services Forsyth County Landfill
Results
Cumming, GA

MSW Landfill Scale Replacement
Infrastructure
Post-Bid
Albany, GA 31705

Site 2 MSWL - Phase 8A Landfill Cell Construction
Results
GA

Reported 01/05/2022 12:00 AM
Project Title

MSW Landfill Step IIB Cell Construction

Physical Address View project details and contacts
City, State (County) GA   (Bartow County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of construction of approximately 55,300 CY of excavation, 34,900 CY of structural fill, 384,100 SF of low permeability liner base, 386,100 SF of Geosynthetic Clay Liner, 386,100 SF of 60 mil HDPE geomembrane, 386,100 SF of Geocomposite Drainage Net, 384,100 SF of protective cover layer; 2,330 LF of perforated leachate collection pipe, 604 LF of solid leachate pipe, 3 leachate cleanouts, sediment pond removal, abandoning a 60-inch HDPE pipe, stormwater management features; and various erosion and sedimentation control items.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents