Similar Projects
1-4/SR 400 - ITS Communication System
Infrastructure
Bidding
$11,624,300 est. value
Seffner, FL 33583

Intelligent Transportation Systems
Infrastructure
Post-Bid
$267,602 est. value
Longwood, FL 32750

New York Avenue Signalization Improvements
Results
Winter Park, FL 32789

Construction Services for Traffic Signalization Improvements at the Intersection of Narcoossee Road and Luminary Boulevard
Results
$444,278 est. value
Orlando, FL 32813

Pre-Event Traffic Signal Repair
Results

Safety Project/Milling and Resurfacing/Lighting/Traffic Signals
Results
$1,725,893 est. value

Transportations Systems Management and Operations
Results
Less than $500,000 est. value

Traffic Calming and Minor Roadway Improvements
Results
$4,658,344 est. value
FL

Traffic Signal Mast Arm Upgrades
Results
$2,420,692 est. value
Orlando, FL

Pre-Event Traffic Signal Permanent Repair
Infrastructure
Results

Sand Lake Road at West Lake Brantley Road Improvements
Infrastructure
Results
$99,761 est. value
FL

Orangewood Boulevard and Gateway Avenue Intersection Improvements
Infrastructure
Results
$3,910,270 est. value
Orlando, FL 32821

Orlando Citywide Pedestrian Traffic Signal Project
Infrastructure
Results
$674,868 est. value
Orlando, FL

Smart Orlando Downtown Advanced Traffic Operations Performance
Infrastructure
Results
$755,856 est. value
Orlando, FL 32801

Traffic Ops Improvement - Traffic Operations Pushbutton Roadway Contract
Infrastructure
Results
$500,000 est. value

Last Updated 06/23/2022 10:53 AM
Project Title

Asset Maintenance- Wekiva Parkway (SR 429/ SR 46)

Physical Address View project details and contacts
City, State (County) (Orange, Seminole Counties)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,014,046
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is an Asset Maintenance Contract for segments of Wekiva Parkway (SR 429), including sections of SR 46 Section 0001 Asset Maintenance (Ls) 0999- 16- Partnering, Do Not Bid Ls 1.000 0999- 20- 2 Disputes Review Board, Hearing- Do Not Bid Ea 1.000 E999- 10- 12 Asset Maintenance: Periodic Payments for Lump Sumcontractea 66.000 E999- 10- 12 Asset Maintenance: Periodic Payments for Lump Sumcontractea 244.000 E999- 30- Asset Maintenance: Traffic Operations - Do Not Bid Ls 1.000

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents