Similar Projects
2022 Bond - Forney Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$1,294,000,000 CJ est. value
Forney, TX 75126

Project Luna / 1111 Akron Way
New Construction, Infrastructure - 278,212 SF
Design
$33,000,000 CJ est. value
Forney, TX 75126

South Pointe Park at Kaufman Sports Village Addition
New Construction, Infrastructure - 147,100 SF
Design
$130,000,000 CJ est. value
Kaufman, TX 75142

Kingsborough East Wastewater Treatment Facility Phase 1
New Construction, Infrastructure
Bidding
$9,950,650 CJ est. value
Crandall, TX 75114

Rehabilitate Existing Roadway - FM 148
Infrastructure
Bidding
$8,260,263 CJ est. value
Kaufman, TX 75142

Water, Sanitary Sewer and Storm Drainage Improvements for Las Lomas Phase 2
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Kaufman, TX 75142

US 80 - Reconstruct Existing Roadway and Bridge Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$119,542,801 CJ est. value
Terrell, TX 75160

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

High Point Special Utility District New Headquarters
New Construction, Infrastructure - 5,364 SF
Construction
$3,000,000 CJ est. value
Forney, TX 75126

High Point Special Utility District New Headquarters
New Construction, Infrastructure - 5,364 SF
Construction
$3,000,000 CJ est. value
Forney, TX 75126

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Stream Mesquite - SRPF c/ Trinity Pointe Phase 1, LP -Building 1
New Construction, Infrastructure - 293,548 SF
Pending Verification
$11,300,000 CJ est. value
Forney, TX 75126

Crossroads at Terrell Phase 2
New Construction, Infrastructure - 366,577 SF
Design
$43,885,000 CJ est. value
Terrell, TX 75160

2153 Crandall HS Multipurpose Weight Room Addition
Addition, Demolition, Infrastructure - 15,800 SF
Post-Bid
$3,500,000 CJ est. value
Crandall, TX 75114

Last Updated 10/02/2023 12:46 PM
Project Title

Grading Improvements for Las Lomas Phase 2

Physical Address View project details and contacts
City, State (County) Kaufman, TX 75142   (Kaufman County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Grading Improvements for Las Lomas Phase 2 Bids must be accompanied by a cashiers check or a bid bond from a surety company holding a permit in the State of Texas for an amount equal to 2% of the amount bid. The amount of said cashier's check or bond will be forfeited to the OWNER and the bank or surety shall be liable to the OWNER for the amount in event the successful bidder fail or refuse to enter into a contract or furnish bonds as hereafter required within ten (10) days after the date of notice of award. Performance and Payment Bonds are required. The OWNER reserves the right to reject any or all bids and to waive informalities or irregularities in bidding in case of lack of clarity in stating prices. The OWNER reserves the right to consider the most advantageous construction thereof, or reject the bid.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents