Similar Projects
Prime Contracting Services for the Utilities Upgrades and Site Improvements Project Phase II
Bidding
Baltimore, MD

Cedar Branch North Fork Relief Sewer - Consent Decree
Bidding
$5,000,001 to $10,000,000 est. value
Ellicott City, MD 21228

Large Diameter Sanitary Sewer Interceptors and Siphons Condition Assessment and Analysis
Term Contract
Post-Bid
Less than $4,500,000 est. value
Baltimore, MD

On-Call Pipeline Grouting
Term Contract
Post-Bid
Towson, MD 21204

Emergency Repair of County-Owned Utilities
Term Contract
Results
MD

Small Business Set-Aside for Sewer Condition Assessment
Results
Adelphi, MD 20783

CCTV Inspection and Cleaning of Sanitary Sewers
Term Contract
Bidding
Frederick, MD

Repair Sleeves and Transition Couplings
Post-Bid
Laurel, MD 20707

Onsite Sewage Disposal System Replacement Ward Hill Salt Storage Facility in Cecil County
Results
$100,001 to $500,000 est. value
Warwick, MD 21912

Maintenance, Repair and Stabilization of Stormwater/Drainage Facilities
Term Contract
Bidding
$25,000 to $250,000 est. value
MD

Septic To Sewer Conversion Project
Post-Bid
Glen Burnie, MD 21060

Dundee Avenue to Kent Narrows Water Main Installation
Results
MD

On-Call Water and Sewer Construction
Term Contract
Bidding
Bel Air, MD

Pipeline Infiltration and Inflow Reduction Project
Post-Bid
Fruitland, MD 21826

Annual Inspection and Septic Pump-Out Service for Radio Shop's 1000 Gallon Septic Tank
Term Contract
Results
Less than $50,000 est. value
Catonsville, MD 21228

Last Updated 10/22/2020 02:33 PM
Project Title

SKI Sanitary Project - Septic Tank Effluent Pumps Phase 2

Physical Address View project details and contacts
City, State (County) Stevensville, MD 21666   (Queen Annes County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Phase is the Second of four phases in a failing septic system abatement project which will consist of two construction contracts: Contract SAN 20-01 - Septic Tank Effluent Pumps Installation. Contract SAN 20-02 - Community Sewer Main Installation. The work of this contract, Contract No. SAN 20-01, consists of the installation of approximately 200 Septic Tank Effluent Pump (STEP) assemblies to service existing homes. Specifically included is the installation of new 1500-gallon concrete tanks, highhead STEP assemblies, electrical work to power the STEP assemblies from the existing home,s electric meter, plumbing work to intercept the existing homes, sewer lateral to the existing septic system and to connect the existing homes to the new STEP assemblies, abandonment of the existing septic tanks, and full restoration of the yards post installation.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Fill, Flowable Fill, Trenching and Backfilling.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving Rehabilitation, Turf and Grasses, Seeding, Sodding.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Utility Septic Tanks, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents