Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Construction Services for Poitras East Community Development District
Post-Bid
FL

Stormwater Drainage Expertise Lakewood Ranch Inter-District Authority Community Development District 5
Post-Bid
Lakewood Ranch, FL 34202

Storm Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Technology
Results
Less than $304,580 est. value
Jacksonville, FL

Y--IGF::OT::IGF RV Work Camp Sewer Connection
Results
Less than $25,000 est. value
Big Pine Key, FL

Stormwater Improvements
Construction
Lake City, FL 32055

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Plugged Storm Drains
Results
Everglades, FL

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

East College, East Jefferson & South Meridian Streets Water and Sewer Improvements
Results
Less than $2,739,200 est. value
Tallahassee, FL

South Campus Stormwater Management - DRA #4 Project
Post-Bid
Pembroke Pines, FL 33024

Stormwater Management System Prevent Maintenance
Term Contract
Results
Sunny Isles, FL 33160

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Pre-Cast Storm Water Control Stuctures
Results
Kissimmee, FL 34741

Blue Lake Elementary - Stormwater Drainage Upgrade
Post-Bid
De Land, FL 32724

Last Updated 08/19/2020 04:23 PM
Project Title

LSSA-NSU and NSU-CSU Potable Interconnect

Physical Address View project details and contacts
City, State (County) The Villages, FL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $86,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this project is to procure a qualified, professional contractor to complete work associated with Potable Interconnects between the NSU-LSSA utilities & NSU-CSU utilities. The NSU-LSSA interconnection includes; but is not limited to, the installation of an altitude valve, mag meters, vault, gate valves and associated fittings to provide automatic supplementation of water between utility systems to prevent low pressures during emergency situations and unexpected equipment failures. The NSU-CSU interconnection includes; but is not limited to, the replacement of inoperable flow meter to accurately monitor flow between the two systems during emergency situations. Work on this project will begin upon awarded Contractor’s receipt of Notice to Proceed, with Substantial Completion expected in 125 days and Final Completion expected within 155 calendar days. The completion date may be extended due to unforeseen circumstances with the approval of the District.

Details

Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Ductile Iron Public Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Primary Control Devices, Primary Control Valves.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents