Similar Projects
O'Reilly Auto Parts MRV / Mauriceville
New Construction, Infrastructure - 7,228 SF
Design
$700,000 CJ est. value
Mauriceville, TX 77626

TownePlace Suites By Marriott / Orange
New Construction, Infrastructure - 65,569 SF
Design
$8,523,970 CJ est. value
Orange, TX 77630

Gulf Coast Division Garrison Siphon Replacement
Infrastructure
Bidding
$504,000 CJ est. value
Orange, TX 77630

2022 Street and Parking Lot Construction
Infrastructure
Post-Bid
Orange, TX

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

2021 Group Seal Coat Program
Results

Eagle Point Parkway and Medical Center Drive - Phase 1
Infrastructure
Results
$1,440,669 est. value
Orange, TX

Murphy USA #5708
New Construction - 1,400 SF
Construction
West Orange, TX 77630

Candlewood Suites / Orange
New Construction, Infrastructure - 40,686 SF
Pending Verification
$3,051,450 CJ est. value
Orange, TX 77630

Entergy Hydrogen Power Plant
New Construction, Infrastructure
Pending Verification
$1,800,000,000 CJ est. value
Bridge City, TX 77611

Dollar General / Vidor
New Construction, Infrastructure - 10,640 SF
Design
$475,000 CJ est. value
Vidor, TX 77662

IH 10 - Widen Existing Mainlanes From 4 to 6 Lanes
Infrastructure
Post-Bid
$52,363,934 CJ est. value
Orange, TX 77630

FM1006-Flexible Pavement Structure Repair
Infrastructure
Results
$1,157,596 est. value
TX

Waffle House Unit #824 / Orange
New Construction, Infrastructure - 1,595 SF
Pending Verification
$150,000 CJ est. value
Orange, TX 77630

SH 87-Surfacing/Roadway Restoration
Infrastructure
Results
$2,535,803 est. value
TX

Last Updated 10/05/2022 03:18 PM
Project Title

King Fuels Food Mart / Vidor

Physical Address View project details and contacts
City, State (County) Vidor, TX 77662   (Orange County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $878,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new gas station. As of October 5, 2022, this project is in the process of getting approvals. An architect has been selected. The owner handles their own construction. Construction is estimated to begin May 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5,800 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents