Similar Projects
Winery and Patio
New Construction, Infrastructure - 4,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rosemount, MN 55068

Tap Society Restaurant
New Construction, Infrastructure - 3,500 SF
Conception
$500,000 to $1,000,000 CJ est. value
Rosemount, MN 55068

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

Bituminous Surfacing, TMS, ADA Improvements and Traffic Signal System
Infrastructure
Bidding
MN

2022 CIPP Lining
Infrastructure
Bidding
West Saint Paul, MN

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

2021 Crack Sealing and Seal Coating
Post-Bid
MN

CSAH 42/Akron Avenue Intersection Improvements
Results
Less than $2,700,000 est. value
Hastings, MN 55033

Grading, Bituminous Mill and Overlay
Results

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Gateway Housing
New Construction, Infrastructure - 75,899 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Burnsville, MN

Fairhill Estate at North Creek Addition
New Construction, Infrastructure
Pending Verification
Farmington, MN

Amber Fields Development
New Construction, Infrastructure - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN

Last Updated 01/24/2022 11:54 AM
Project Title

210th Street and Lakeville Boulevard Improvements

Physical Address View project details and contacts
City, State (County) Lakeville, MN 55024   (Dakota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway Reconstruction, utility (storm sewer, watermain, sanitary sewer) improvements, widening and urbanizing to include concrete curb and gutter and pedestrian trails, roundabout. 65700 CU YD Excavation - Common 17000 CU YD Excavation - Subgrade 26000 CU YD Excavation - Channel and Pond 31500 CU YD Select Granular Embankment (CV) 49700 CU YD Common Embankment (CV) 36100 TON Aggregate Base Class 5 29300 TON Bituminous Pavement 31970 LIN FT Curb and Gutter 5500 LIN FT Watermain 14100 LIN FT Storm Sewer

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents