Similar Projects
Last Updated | 03/30/2023 03:37 PM |
Project Title | Barrs Branch Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Alexandria, KY 41001 (Campbell County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $900,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All questions during bidding should be addressed to Robert Seitzinger, P.E., who can be reached at 859-534-9936. The Campbell County Fiscal Court will accept bids for the bridge replacement and beam/wingwalls project. Bid bonds, performance bonds, and payment bonds as prescribed by KRS 45A.430, 435, 440 are required for any bids/proposals that exceed $99,999. Each bid, or the combination of submitted bids, over $99,999 must be accompanied by a 10% bid bond of the grand total of the bid. The bid bond of the successful bidder will be retained until a performance bond has been executed and approved, after which the bid bond will be returned. The successful bidder will be required to post a performance bond in the amount of 100% of the bid if awarded a contract over $99,999. Bonding and surety requirements may vary by project/commodity. Please contact Owner for more information. Reserved Rights 1. Campbell County Fiscal Court reserves the right to reject any or all bids, including without limitations the right to reject any or all nonconforming, non-responsive, incomplete, unbalanced, or conditional bids, to waive formalities, and to reject the bid of any Bidder if CCFC believes that it would not be in the best interest of Campbell County Fiscal Court to make an award to that Bidder. CCFC also reserves the right to negotiate with the apparent qualified Bidder to such an extent as may be determined by Campbell County Fiscal Court. 2. CCFC reserves the right of renewal for any service and maintenance contracts that may be needed for a minimum of two (2) one (1) year periods. 3. In the event the successful bidder fails to commence substantial work on the project within thirty (30) days and the County does not waive this requirement, the County shall have the option to reject the bid and to void the contract, and in such event to either accept the next lowest and best bidder or to negotiate with the best qualified bidder 4. In the event the successful bidder fails to complete the project by the completion date and the County has not waived this requirement in writing, the County shall receive from the bidder (or withhold from the bidder, at its option) liquidated damages of 1% per project per calendar day. 5. All the terms and conditions of these instructions to bidders and the specifications for this project shall constitute, the part of, and incorporate into, the contract between the County and the successful bidder. Award It is the intent of Campbell County Fiscal Court to award a contract to the lowest responsible bidder meeting specifications. CCFC reserves the right to determine the lowest responsible bid/offer in any way determined to be in the best interests of Campbell County. Award will be based on the following factors (where applicable): (a) adherence to all conditions and requirements of the bid/proposal specifications; (b) price; (c) qualifications of the bidder, including past performance, financial responsibility, general reputation, experience, service capabilities, and facilities; (d) delivery or completion date; (e) product appearance, workmanship, finish, taste, feel, overall quality, and results of product testing; (f) maintenance costs and warranty provisions; and (g) repurchase or residual value. Contract is anticipated to be awarded at the April 5, 2023 Campbell County Fiscal Court Meeting. Upon award a preconstruction meeting will be scheduled and contracts signed. At that time, shop drawings shall commence and review and approval can occur as well as construction and MOT setup. HOWEVER, PLEASE NOTE funding for this project is in the FY2024 (July 1, 2023 - June 30, 2024) budget, therefore, billing of the project cannot occur until July 1, 2023. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |