Similar Projects
Tennis Court Replacement at War Memorial Recreation Center
Bidding
$400,000 est. value
Cambridge, MA 02138

Emerson Park Improvements Phase 1
Bidding
$800,000 to $850,000 est. value
Concord, MA 01742

Walsh Field Improvement
Post-Bid
$570,000 est. value
Framingham, MA 01702

Reconstruction of Rossetti Park
Post-Bid
Everett, MA

T.J. O’Grady Skate Park Expansion Phase II
Results
$200,000 est. value
Acton, MA 01720

Tennis and Basketball Court Repairs at Various Locations
Term Contract
Results
Less than $50,000 est. value
Newton Center, MA 02459

Mary Cummings Park Improvements
Renovation
Construction
$400,000 est. value
Burlington, MA 01803

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Triangle Park
Bidding
$3,130,000 est. value
Cambridge, MA

Park Improvements for Gertrude Spaulding Park
Post-Bid
Less than $150,000 est. value
Wakefield, MA 01880

Little League Field Renovation
Results
Less than $49,000 est. value
Holliston, MA

Sennott Park Renovation
Bidding
$1,750,000 est. value
Cambridge, MA 02139

Manchester Field 400M Running Track Repair and Resurfacing Project
Post-Bid
Less than $135,000 est. value
Winchester, MA 01890

Edmund Murphy Sports Complex Improvements
Results
Dracut, MA 01826

Pocket Park Improvement and Maintenance of Cobble Traffic Islands
Post-Bid
$25,000 est. value
Lincoln, MA

Last Updated 04/09/2021 11:06 AM
Project Title

Healey Schoolyard, Soccer Field and ADA Path Construction

Physical Address View project details and contacts
City, State (County) Somerville, MA 02145   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City seeks a full range of construction services to renovate the approximately 135,000 square foot Arthur D. Healey Schoolyard. The site is adjacent to the Healey School in a densely populated residential neighborhood. It includes the schoolyard, parking lot, and the large slope descending from the school to the Mystic Housing Community below. The scope of work is extensive and includes the new schoolyard, a U-12 Synthetic Turf soccer field, a substantial unit block retaining wall, and a new ADA compliant ramp system descending the slope between the schoolyard and Connors Drive below, in three long segments with connecting staircases.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents