Last Updated 10/12/2020 11:20 AM
Project Title

WRAIR, Preventive Maintenance and Service for Water for Injection/Pure Steam/Distribution Systems

Physical Address View project details and contacts
City, State (County) Silver Spring, MD 20910   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Our vision is to be the premier DoD biomedical research organization, constantly relevant, integrating basic research and advanced technology that protects, projects, and sustains the Warfighter today, invents global medical solutions for the future, and keeps the Warfighter on point for the Nation. We host two Centers of Excellence for Military Psychiatry and Neuroscience Research and for Military Infectious Disease Research, each center ranging from blast induced neurotrauma to malaria vaccine development. The Pilot Bioproduction Facility (PBF) conducts research, development, production, and testing of vaccines and other biological products. Production is performed following and products are tested in compliance with current Good Manufacturing Practices (cGMP). Production is pilot-scale: 500 – 20,000 doses per finished lot of product. Products are released for use in Phase I - IIb clinical studies under Investigational New Drug applications (INDs). Vaccines being produced include, but are not limited to, those for prophylaxis against shigellosis, meningitis, malaria, and dengue fever. Conventional as well as recombinant and other genetically engineered vaccines are undergoing development and production at WRAIR. Other types of biological products (i.e. therapeutics) are capable of being produced as well under the right circumstances. A multiple effect distillation unit has been installed that vaporizes Reverse Osmosis/Deionized CAP II water. WFI is condensed from the PS output of up to three multiple effect distillation columns, which is then sent to a WFI storage tank. The contents of the storage tank is then circulated by the WFI distribution pumping system. This system includes a cooled circulation section of piping and a heated circulation section. Upon return to the storage tank, all water is reheated and injected back into the WFI tank. A fraction of the PS generated by the columns is not condensed and is instead sent to the pure steam distribution system. This system supplies autoclaves, fermenters, various other equipment, and manual use points within the PBF with pure steam for sterilization. SCOPE: The contractor will perform Quarterly, Bi Annual, Annual Maintenance, Five Year Overhaul, Preventive Maintenance, Emergency Maintenance, and Periodic/Volumetric Maintenance for the WFI/PS Systems. PERFORMANCE REQUIREMENTS: Specific Tasks / Requirements Quarterly: Review of Unit Operation (Includes Daily/Monthly checks) (Deliverable 2) • Perform Operational Safety checklist. • Check that the calibration status of all instruments are within the expected range of operation. Recalibrate instruments as necessary. • Check the distillate NORMAL / DUMP switch for operation. Observe the valves changing position. • Check the entire unit for leaks. • Blow down steam and condensate strainers. • Check and adjust blowdown flow. • Calibrate sanitary pump effluent discharge flow. Biannual (every six months) (Deliverable 3): • Perform TOC/conductivity analyzer calibration. • Replace sanitary pump seals, as needed. Annual: Replacement of Product Contact Elastomers (Includes Quarterly and Biannual Items) During Maintenance Shutdown (Deliverable 4) • Perform all routine quarterly PM items listed above (section 6.1.1). • Perform loop calibration of all sensors (TOC, conductivity, pressure, flow) and variable frequency drives. • Perform calibration of all gauges. • Replace filters, including 0.2 micron vent filters. • Chemically clean the units, tank, and distribution piping. • Replace feed water pump seals, if required. • Check steam traps and strainers, rebuild if required. • Check all electrical connections on the skids. • Check and descale cooling water side of condenser as required. Rigging is required. • Check and descale heat exchangers. Rigging is required. • Replace gaskets on each effect evaporator, as needed. • Replace condenser gaskets. • Perform hydrostatic test of condenser and all effects, if required. • Perform hydrostatic test of distribution loop heat exchangers. • Change PLC batteries. • Replace product contact piping gaskets, orifice gaskets, and valve diaphragms in the WFI/PS, Distribution System, and use points. • Upon completion of the annual maintenance work perform de-rouging, passivation, cleaning, rinsing, and re-sanitization of the WFI/PS tank, distribution piping systems, heat exchangers and field use points, as needed, to return the system to USP Chapter <1231> generation specifications. Five Year Overhaul: Replacement of all System Elastomers (Includes Annual Items) (Deliverable 5) • Perform all annual PM items. • Re-gasket the entire units (WFI/PS and Distribution Systems). • Rebuild all diaphragm valves. • Repack degasser, as necessary. The vendor shall supply all rigging, materials, supplies, and like-for-like piece/parts for the WFI/PS, and Distribution systems. Calibration per ISO requirements of all components of the system that include but are not limited to TOC, conductivity, time, pressure, temperature, and flow with recorded as-found and as-left values. An overall safety assessment report is to be included during annual maintenance. Emergency Services: The contractor shall provide up to two emergency service visits per contract year per system (WFI/PS/Distribution – 3 systems) with a response time not to exceed 24 hours including evaluation of failure mode, repair and/or replacement (or as soon as possible) for any piece or part of the WFI/PS systems.

Details

Division 11 - Equipment.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Humidity Control Equipment, Humidifiers, Direct-Steam-Injection Humidifiers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents