Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

Comprehensive Everglades Restoration Plan, Biscayne Bay Coastal Wetlands, L-31E Flow-Way, Contract 5C (A Phase I Project): Pump Stations S-710 And S-711; Seepage Canal C-711W; Miami-Dade County, Florida
New Construction
Design
$15,000,000 to $25,000,000 est. value
Miami, FL

Orange County Utilities Pump Station Package 40
Bidding
$2,068,770 est. value
FL

Lift Station 14-A FM Replacement and Extension
New Construction
Bidding
$2,374,212 est. value
Bradenton, FL

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

City of Cape Coral Fire Station #2
New Construction - 10,559 SF
Construction
Fort Myers, FL 33990

Braden Woods Lift Station Upgrade and New Force Main
Infrastructure
Bidding
$1,707,475 est. value
FL

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

As-Needed Pump Station Rehabilitation Program
Renovation, Term Contract
Bidding
$7,500,000 est. value
Port Richey, FL 34668

Cooper Creek Lift Station Relocation
Renovation
Post-Bid
$1,200,000 est. value
University Park, FL 34201

Last Updated 09/01/2021 02:03 PM
Project Title

Chimney Pines Lift Station 285 Rehabilitation

Physical Address View project details and contacts
City, State (County) Pensacola, FL   (Escambia County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principle features of the work will consist of the Contractor removing the valve vault, we well and electrical equipment to match ECUA’s current lift station standard design.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents