Similar Projects
Highpoint
New Construction - 588,000 SF
Conception
Stuart, FL 34997

Watercress Cove
New Construction
Conception
North Port, FL

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Cuna Street Dining
New Construction, Renovation
Design
Saint Augustine, FL

Mechanical Site Prep of Approximately 135 Acres
Bidding
FL

115 South MLK JR Site Development
Bidding
Clearwater, FL 33756

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Lamb Tail Lane West Expansion
New Construction
Post-Bid
Jacksonville, FL 32256

Job Order Contracting Services for Civil Site Work
Results
Tampa, FL 33602

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Morgan's Cove Assisted Living - Site Work
Construction
$35,000,000 est. value
Saint Augustine, FL

Harlem Heights - Site Development
New Construction
Construction
Fort Myers, FL

11134 New Kings Road RV Park
New Construction
Pending Verification
Jacksonville, FL 32219

Pace Commons
New Construction
Pending Verification
Pace, FL

Catty Shack
New Construction, Addition
Conception
$8,000,000 est. value
Jacksonville, FL

Last Updated 07/21/2020 03:02 PM
Project Title

Sugarmill Electric Upgrade Directional Bore

Physical Address View project details and contacts
City, State (County) New Smyrna Beach, FL   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $547,694
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Horizontally directional drill (H.D.D.) high-density polyethylene (HDPE) conduit for new primary and secondary electric cable along club house boulevard in the sugar mill development located north of pioneer trail, just east of i-95 in New Smyrna Beach, Florida. The HDPE conduit shall be smooth wall, gray, SDR 13.5 meeting, at a minimum, ASTM F-2160, ASTM D-3035, NEMA TC-7 and UL-651 specifications. to maximize efficiency, contractor shall size reamer such that multiple conduits can be pulled at one time whenever possible. from each entry and exit pit, the HDPE conduit shall be continuous. there are existing energized conductors throughout the project limits that will remain energized during the drilling operation. at the locations where HDPE conduit is being installed to existing/energized electric equipment, conduit shall stop short 5 feet from the center line of the equipment, terminating 24-inches above finished grade. there are 28 locations that are designated for proposed electric equipment (de-energized applications). contractor shall install the schedule 40 PVC fittings, connect to the HDPE conduit and install the specified pull box, switchgear base or sectionalizing enclosure ground sleeve. the commission will supply the pull box, switchgear base and sectionalizing enclosure ground sleeve.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents