Similar Projects
Boiler Replacement/ Camp Williams
Alteration
Conception
$444,400 est. value
Camp Douglas, WI

Install Dump Probes and High Water Probes at the Boiler Bldg. 112
Term Contract
Design
Milwaukee, WI 53295

Replace Condensate Line - MEP
Infrastructure
Sub-Bidding
$88,000 CJ est. value
Waupaca, WI 54981

Hillcrest Elementary Cooler / Freezer
Post-Bid
Chippewa Falls, WI 54729

Boiler Replacement
Infrastructure
Post-Bid
Waukesha, WI 53188

Boiler and Cooling Tower Pumps Replacement
Results
Oshkosh, WI

Green Bay Boiler Replacement
Results
$166,000 est. value
Madison, WI

Courthouse Mechanical Equipment Upgrade
Alteration
Post-Bid
Crandon, WI

Clinton Rose Senior Center Second Boiler Install and Exhaust Fans Replacement and Mcgovern Senior Center Exhaust Fans Replacement
Results
Milwaukee, WI 53212

Mechanical Demolition
Demolition
Post-Bid
Milwaukee, WI

Arts Sculpture Laboratory - MEP
Results
$2,020,000 est. value
Whitewater, WI 53190

Boiler Maintenance Services at Airport
Term Contract
Post-Bid
Green Bay, WI 54313

Utility Tunnel Steam and Condensate Repairs
Results
Less than $150,000 est. value
Waupun, WI 53963

Le Phillips Library - Bp04 Drapery And Track
Renovation, Alteration
Post-Bid
Eau Claire, WI 54701

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Last Updated 09/30/2022 10:11 AM
Project Title

Boiler Feed System Replacement at South Shore Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Oak Creek, WI 53154   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Boiler Feed System Replacement at South Shore Water Reclamation Facility Contract TS-2708 For the Boiler System Project The project consists of furnishing and installing a replacement boiler feed receiver and control panel compatible with the existing pumps in Building 309 at the South Shore Water Reclamation Facility. If you have questions contact Emily Neidhardt at eneidhardt@mmsd.com. October 31 st , 2022 Notice to Proceed (estimated) ; All work must be completed within 224 days of the Notice to Proceed. To encourage SWMBE participation, the District has established procurement goals of 13% for MBE's, 5% for SBE/VBE's, and 2% for WBE's

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents