Similar Projects
East Fourth Street (Cantebury): 4th - Quincy New Road w/ Roundabout - City of Pittsburg
Infrastructure
Conception
$3,500,000 CJ est. value
Pittsburg, KS 66762

East Fourth Street (Cantebury): 4th - Quincy New Road w/ Roundabout - City of Pittsburg
Infrastructure
Conception
$3,500,000 CJ est. value
Pittsburg, KS 66762

Grading, Bridge and Surfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Cummings, KS 66016

Grading, Bridge and Surfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Cummings, KS 66016

Coffey County Offsite Parking Improvements
Infrastructure
Sub-Bidding
$360,000 CJ est. value
Burlington, KS 66839

Coffey County Offsite Parking Improvements
Infrastructure
Sub-Bidding
$360,000 CJ est. value
Burlington, KS 66839

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Quincy Street Improvements
Infrastructure
Post-Bid
Pittsburg, KS 66762

Milling and HMA Overlay
Infrastructure
Results
KS

Milling and HMA Overlay - FR KS/OK ST LN N to the US-160/US-183/K-34 JCT in CA CO. LGTH 13.530 MI
Infrastructure
Results
KS

Highway 81 - City of Concordia
Infrastructure
Pending Verification
$899,157 CJ est. value
Concordia, KS 66901

Highway 81 - City of Concordia
Infrastructure
Pending Verification
$899,157 CJ est. value
Concordia, KS 66901

200th Street: Atkinson - US 160 Widening & Shoulders - City of Pittsburg
Infrastructure
Conception
$1,187,000 CJ est. value
Pittsburg, KS 66762

Pavement Surfacing Improvements Main St (US-77) and 9th Ave (US-160)
Infrastructure
Bidding
$700,000 CJ est. value
Winfield, KS 67156

Lagoons and Lift Station
Renovation
Post-Bid
$500,000 est. value
Strong City, KS

Last Updated 04/13/2023 03:38 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Susank, KS 67544   (Barton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the installation of 16,280 LF of 8" PVC water main, 193,325 LF of 6" PVC water main, 330,170 LF of 4" PVC water main, 18,860 LF of 3" PVC water main, 18,750 LF of 2" PVC water main, with varying lengths of 1" HDPE service line, varying quantities and size of gate valves, pressure reducing valves, air release valves, flush hydrants, meters, and related appurtenances, including pipeline, stream, railroad, county road, and KDOT highway crossings; existing pump station rehabilitation; standby generator; the removal of seven (7) water storage standpipes of varying sizes; the construction of a 250,000-gallon single pedestal-style, welded steel water storage tower; and the construction of a 12'-diameter by 130'-tall, welded steel water storage standpipe. Direct all questions to Jared Brooks at jbrooks@schwab-eaton.com

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents