Similar Projects
FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

Water Distribution And Wastewater Collection System Controls Upgrade
Infrastructure
Results
MT

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Professional Services for Fairgrounds Paving Projects
Infrastructure
Post-Bid
Helena, MT 59602

Professional Engineering Services - Development of a Wastewater Collection and Treatment System Master Plan
Infrastructure
Bidding
Helena, MT

Water Reclamation Facility On-call Engineering Services
Infrastructure
Post-Bid
Bozeman, MT 59715

Architecture and Engineering Services - College of Nursing
New Construction, Infrastructure
Bidding
Helena, MT

Water Treatment Plant On-call Engineering Services
Infrastructure
Post-Bid
Bozeman, MT 59715

Preliminary Engineering Report Final Construction Design and Inspection, Engineering Services
Infrastructure
Bidding
Grass Range, MT

Engineering Services
Infrastructure
Post-Bid
Lakeside, MT 59922

On-Call City Engineer - On-Call City Planner
Term Contract, Infrastructure
Bidding
White Sulphur Springs, MT

Transit Development Plan for the Met Transit Division
Infrastructure
Post-Bid
Billings, MT

Reported 12/11/2021 12:00 AM
Project Title

Professional Engineering Services - Development of bypass Pumping Facilities at Three of the District's Lift Stations

Physical Address View project details and contacts
City, State (County) Kalispell, MT   (Flathead County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To providing professional engineering services to the District for planning, engineering design, preparation of construction drawings and specifications, bidding assistance, and construction administration for the development of bypass pumping facilities at three of the District's lift stations, #2, #15, and #19; The District currently operates a wastewater collection system within the Community of Evergreen which is divided into twenty-five separate collection areas. Each collection area discharges to one of the twenty-five lift stations (step-system) which is progressively pumped to the next downstream collection area until the wastewater reaches the final lift station, Lift Station No. 19 (LS#19). LS#19 is the District's primary lift station which ultimately pumps all of the District's wastewater through a 14-inch force main that runs 22,010 ft and terminates at the City of Kalispell's Wastewater Treatment Plan for treatment.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents