Similar Projects
Santee Experimental Forest Beaver Control
Design
Cordesville, SC 29434

Pest Control Services
Term Contract
Bidding
Moncks Corner, SC

Pest Control Services
Term Contract
Bidding
Richland, SC

Pest Control Management
Post-Bid
Columbia, SC 29207

Post-Wide Pest Control Management Support Services for IMCOM, Directorate of Public Works (DPW) Fort Jackson
Post-Bid
Columbia, SC

S207--Integrated Pest Control Services-Ralph H Johnson VAMC, Fisher House and Myrtle Beach Primary Care
Results
Charleston, SC 29401

S201--Window Washing VA Columbia Healthcare System
Term Contract
Results
Columbia, SC 29209

Portable Toilets
Term Contract
Bidding
Aiken, Belvedere, Graniteville, New Ellenton, Ridge Spring, Salley, Warrenville, Windsor, SC 29841

District Wide Pest Control Integrated Pest Management (IPM)
Term Contract
Post-Bid
Charleston, SC 29405

Feral Hog Control Savannah River Site
Results
New Ellenton, SC

Removal Of Trees And Stumps At Ensor Forest Apartments
Term Contract
Bidding
Columbia, SC 29203

Pest Control Services
Post-Bid
Greenville, SC 29605

Water Mitigation Services
Results
Columbia, SC

Debris Management And Emergency Response Management And Recovery Services
Alteration
Bidding
Kiawah Island, SC

Service Contractors Pool
Term Contract
Post-Bid
Columbia, SC 29204

Last Updated 04/06/2022 03:28 PM
Project Title

Portable Toilets and Handwash Stations

Physical Address View project details and contacts
City, State (County) Eastover, SC   (Richland County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The delivery breakout will be as follows: Location 1: Twelve (12) porta potty units and six (6) handwashing stations. Location will be used by approximately 200 Pax Location 2: Four (4) porta potty units and two (2) handwashing stations. Location will be used by approximately 130 Pax Location 3: Four (4) porta potty units and two (2) handwashing stations. Location will be used by approximately 70 Pax Location 4: Four (4) porta potty units and two (2) handwashing stations. Location will be used by approximately 110 Pax

Details

Division 01 - General Requirements, Construction Facilities, Sanitary Facilities.
Division 10 - Specialties, Schedules for Specialties, Schedules for Interior Specialties, Toilet, Bath, and Laundry Accessory Schedule.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents