Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

2019 State Street Waterline Replacement
Results
Less than $1,200,000 est. value
Murray, UT 84107

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Mountain Dell Outlet Rehabilitation - Control Valves Pre-Purchase
Post-Bid
Salt Lake City, UT 84115

500 South Surplus Siphon Vault Replacement
Results
Less than $244,438 est. value
Salt Lake City, UT 84104

Conductor Pipe for Stratigraphic Well
Post-Bid
Salt Lake City, UT

Scenic Drive Upper Conduit Slipline Project
Results
Less than $695,500 est. value
Salt Lake City, UT 84104

4100 South Secondary Waterline Project
Post-Bid
Magna, UT 84044

State Street Waterline Replacment
Results
Murray, UT 84107

Little Cottonwood Penstock Lining Repair
Post-Bid
Murray, UT 84107

Arnold Springs Improvements Project
Results
Less than $256,561 est. value
Herriman, UT 84096

Secondary Water Meter Installation
Post-Bid
South Jordan, UT 84095

Last Updated 06/18/2020 11:22 AM
Project Title

3900 South Improvements Project, Phase 1 - Pipeline Project

Physical Address View project details and contacts
City, State (County) Holladay, Millcreek, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,410,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 875 feet of 24” ductile iron pipe, 34 feet of 16” ductile iron pipe, 2,194 feet of 12” ductile iron pipe and 47 feet of 8” ductile iron pipe in 3900 South from the Salt Lake City property at 3184 East and in the public right of way. The 24” and one of the 12” waterlines will end at the Birch Drive intersection. While the second 12” waterline will extend further east to 3396 East. The 16” will extend north 34 feet where it will connect into an existing 12” waterline and reduce to 8” and extend north 47 feet. There are multiple connections to existing waterlines and one crossing of the Salt Lake Aqueduct, owned by Metropolitan Water District of Salt Lake and Sandy. The work in 3900 South must be completed and coordinated with the 3900 South Reconstruction roadway improvements project being completed by Millcreek and Holladay City. This construction contract also includes installation of approximately 475 feet of 8” pipe to connect with three existing pipes at Upland Drive and Viking Road. There is also a conditional 447 feet of 8” waterline along the north side of 3900 South to Olympic Way. This portion of waterline work dependent upon Fiber Optic relocation working being completed by others. Work also includes but is not limited to, water service replacements, fire hydrant reconnection, installation of gate valves, butterfly valves, thrust blocks and repairs to asphalt, curb & gutter, sidewalk and other surfaces.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents