Similar Projects
Kendall Campus Makers Lab
Design
$5,000,000 to $7,000,000 est. value
Kendall, FL

CasaCuba Culture Center
New Construction - 58,000 SF
Design
$23,000,000 est. value
Miami, FL 33199

Remodeling and Renovation of Case Building - CM
Renovation - 61,783 SF
Bidding
Miami, FL 33199

Deferred Maintenance Projects - Kendall Campus - Buildings 100
Post-Bid
$7,000,000 to $10,500,000 est. value
Miami, FL 33176

Miami Dade College North Campus Artificial Intelligence Center
Post-Bid
$2,950,000 to $3,185,000 est. value
Miami, FL 33132

Wolfson Campus Building 3000 Upgrades
Renovation
Results
Less than $7,000,000 est. value
Miami, FL 33132

Continuing Services Contract to Provide Minor Construction Management (CM) Services
Renovation
Results
Less than $200,000 est. value

Homestead Campus New Student Success Center
New Construction - 65,000 SF
Construction
Less than $22,865,661 est. value
Homestead, FL 33030

Miami Dade College West Campus, Structural Improvements Phase IIIA
Construction
Medley, Miami, FL 33178

Building 6000 Exterior Waterproofing Project
Post-Bid
Kendall, FL 33176

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Results
Lakeland, FL 33868

St.Thomas University - Student Housing
New Construction
Construction
$22,000,000 est. value
Hialeah, FL 33054

Building 2000 Hvac Equipment Replacement
Post-Bid
Kendall, FL 33176

Wolfson Campus Building 2000 Upgrades
Renovation
Results
$5,500,000 to $8,500,000 est. value
Miami, FL 33132

Eduardo J. Padron 11th, 12th, 14th, and 15th Floors Renovation Project
Renovation
Construction
Miami, FL 33135

Reported 01/25/2022 07:10 AM
Project Title

Mdc Wolfson Bldg. 2000 Artificial Intelligence

Physical Address View project details and contacts
City, State (County) Miami, FL 33132   (Miami-Dade County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $2,200,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work consists of demolition and renovation of space at Bldg. 2000 into a new Artificial Intelligence Center.Total sq ft for project not available at this time.

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents