Similar Projects
Tennis Court Replacement at War Memorial Recreation Center
Bidding
$400,000 est. value
Cambridge, MA 02138

Rubber Surface Replacement at Maple and Marie Park and Cooper Park
Bidding
$113,000 est. value
Cambridge, MA

Park Improvements for Veterans Field
Sub-Bidding
$300,000 est. value
Wakefield, MA

Reconstruction of Rossetti Park
Post-Bid
Everett, MA

Park Improvements for Gertrude Spaulding Park
Post-Bid
Less than $150,000 est. value
Wakefield, MA 01880

T.J. O’Grady Skate Park Expansion Phase II
Results
$200,000 est. value
Acton, MA 01720

Tennis and Basketball Court Repairs at Various Locations
Term Contract
Results
Less than $50,000 est. value
Newton Center, MA 02459

Mary Cummings Park Improvements
Renovation
Construction
$400,000 est. value
Burlington, MA 01803

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Park Improvements for Veterans Field
Bidding
$300,000 est. value
Wakefield, MA

Manchester Field 400M Running Track Repair and Resurfacing Project
Post-Bid
Less than $135,000 est. value
Winchester, MA 01890

Infield Renovation and Warning Track Resurfacing of Rindge Field
Results
$50,000 est. value
Cambridge, MA 02140

Healey Schoolyard, Soccer Field and ADA Path Construction
Bidding
$5,000,000 est. value
Somerville, MA 02145

Pocket Park Improvement and Maintenance of Cobble Traffic Islands
Post-Bid
$25,000 est. value
Lincoln, MA

Little League Field Renovation
Results
Less than $49,000 est. value
Holliston, MA

Reported 03/17/2020 12:00 AM
Project Title

Walsh Field Improvement

Physical Address View project details and contacts
City, State (County) Framingham, MA 01702   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $570,000
Plans Available from Municipal Agency - 02/26/20
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation and renovation of the current track and field at the Walsh Middle School Lower Athletic Complex. Specifically, this project will include removal of current track, replacing it with a smaller walking pathway; formalizing accessible parking off of the Walsh School driveway; removing and capping current drainage structures within the center playing field below grade; installation of a new natural turf field within the center area of the track; installation of irrigation system to all areas shown in site plans; and overall stormwater drainage improvements. This project is contingent upon capital funding approval by City Council for fiscal year 2020 (July 1, 2019). In addition, this project must follow a strict timeline for completion by August 21, 2019 to avoid any conflict with normal school operations.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents