Similar Projects
Paint and Drywall Services Contract
Bidding
Clemson, SC 29634

Comprehensive Purchasing Consortium for CCHRCO
Bidding

North Hope Center Interior Paint Project
Post-Bid
Sumter, SC

Turn-Key Locker Repair and Refinishing at Lancaster High School - Rice Building
Post-Bid
Lancaster, SC 29720

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Design-Build Services for Town Council and Municipal Court Chambers
Results
West Columbia, SC 29172

Kershaw County Lab Upfits
Construction
$150,000 to $180,000 est. value
Camden, SC

Slater Hall Primary Facade Restoration
Bidding
Slater, SC

Fiberglass Fish Tanks
Post-Bid
Orangeburg, SC

Center for the Arts Blinds
Results
Greer, SC 29651

Privacy Walls for Kiosks
Bidding
Charleston, SC

9390--Fabricate & Install Bathroom Panels, Sinks & Counters
Post-Bid
Columbia, SC 29209

Furnish and Deliver and Install DIRTT Walls
Results
Columbia, SC 29208

Ramp Modification
Bidding
$20,000 est. value
Columbia, SC

Partition Maintenance and Repair
Post-Bid
Myrtle Beach, SC 29578

Reported 07/01/2020 12:00 AM
Project Title

Larne Building Ceiling Repair

Physical Address View project details and contacts
City, State (County) Clover, SC 29710   (York County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To repair approximately 300 square feet of ceiling at the Larne Building, 103 North Main Street, Clover, South Carolina.The Scope of Work shall include: 1. Provide all building materials, labor, equipment, supervision, permits, etc. to complete the repair of approximately 300 square feet of ceiling. A Town Building Permit is required to be pulled but there will not be a fee. 2. Removal and disposal of the damaged building material such as sheet rock and the ceiling tiles that are in place. 3. Protection of the floor and fixtures in this historic building is of utmost importance. All due care should be taken to prevent damage. 4. Exact match of ceiling tiles is required. 5. All work to be completed in accordance with the industry specifications, building codes, and permitting requirements.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents