Similar Projects
2022 Capital Projects
Infrastructure
Bidding
$700,000 est. value
Fruit Heights, UT

Hyde Park City Canal Footbridge
Post-Bid
Hyde Park, UT

Oquirrh Hills Golf Course Pond 2 Expansion Project
Post-Bid
Tooele, UT

Cottonwood Heights Recreation Improvements Project
Results
Cottonwood Heights, UT 84121

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

Traverse Mountain Emergency Watershed Protection
Results
Lehi, UT 84043

Kolob Terrace Road Retaining Walls
Infrastructure
Post-Bid
Saint George, UT

Mcelmo Creek Bridge - 037012C
Results
$1,500,000 to $3,000,000 est. value
UT

UDOT Drainage Repair US 89 MP 340.10 on the Left Side of the Road
Infrastructure
Post-Bid
Orem, UT 84097

Pratt Aquatic Center - Pool Deck Drain Repair
Results
$175,900 est. value
Tooele, UT 84074

Uintah Indian Irrigation Project
Infrastructure
Post-Bid
UT

Meadow MS4 Project
Results
Meadow, UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Green River MS4
Results
Green River, UT 84525

Reported 05/11/2022 12:00 AM
Project Title

UDOT Vernal MS4 Project

Physical Address View project details and contacts
City, State (County) Vernal, UT   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022, Construction Completion Expected September 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services related to new wash rack and material storage bins. The demolition of the water retention/detention facilities and desalination evaporative ponds. Existing wash rack will be removed and preserved for future use ata different location. Installation of fixed equipment (provided as part of the work unless otherwise noted), utility connections and fees, excavation, grading and other site improvements are required as part of the work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents