Last Updated | 05/20/2022 02:11 AM |
Project Title | Viroqua - Richland Center, Mahoney Road To s. Junction Sth 131; Viroqua - Richland Center, Bishop Branch Bridge, b-62-258 |
Physical Address | View project details and contacts |
City, State (County) | WI (Vernon County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers, Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation Common, 3,462 CY; Borrow, 2,718 CY; Backfill Structure, 1,253 Ton; Base Aggregate Dense, 8,856 Ton; Select Crushed Material, 1,935 Ton; Breaker Run, 75 Ton; Concrete Pavement, 188 SY; Concrete Masonry Bridges, 546 CY; Concrete Masonry Culverts, 70 CY; Prestressed Girders, 1,044 LF 45W-Inch; Bar Steel Reinforcement, 19,320 Lbs; Bar Steel Reinforcement Coated, 82,480 Lbs; Piling Steel, 650 LF 12-Inch, 490 LF 14-Inch; Marking Epoxy, 238,398 LF; Marking Paint, 72 LF; Construction Staking, 65,001 LF; Construction Staking, 4 Each; Construction Staking, 4 LS; Culvert Pipe, 88 LF 18”, 246 LF 24“, 6 LF 30“; Concrete Curb and Gutter, 1,690 LF; Beam Guard, 10,903 LF; Beam Guard Energy Absorbing Terminals, 29 Each; Asphaltic Surface, 616 Ton; HMA Pavement, 39,253 Ton; Tack Coat, 10,111 Gals; Signs, 27 SF; Pulverize and Relay, 172,884 SY; Steel Diaphragms, 16 Each; Culvert Liners, 362 LF; Riprap, 1,274 CY; Asphaltic Binder Enhanced Friction Surface Treatment, 11,854 SY |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |