Similar Projects
O'Reilly Auto Parts MRV / Mauriceville
New Construction, Infrastructure - 7,228 SF
Design
$700,000 CJ est. value
Mauriceville, TX 77626

TownePlace Suites By Marriott / Orange
New Construction, Infrastructure - 65,569 SF
Design
$8,523,970 CJ est. value
Orange, TX 77630

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Street and Parking Lot Construction
Infrastructure
Post-Bid
Orange, TX

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

Eagle Point Parkway and Medical Center Drive - Phase 1
Infrastructure
Results
$1,440,669 est. value
Orange, TX

Construction of the LCM Middle School Back Drive HMAC Rehabilitation
Infrastructure
Results
Orange, TX 77632

Chevron Phillips and QatarEnergy- US Gulf Coast II Petrochemical Project
New Construction, Infrastructure
Pending Verification
$8,500,000,000 CJ est. value
Orange, TX 77632

Candlewood Suites / Orange
New Construction, Infrastructure - 40,686 SF
Pending Verification
$3,051,450 CJ est. value
Orange, TX 77630

Olson Engineering Building Addition
Addition, Demolition, Infrastructure - 12,606 SF
Design
$3,000,000 CJ est. value
Bridge City, TX 77611

IH 10 - Widen Existing Mainlanes From 4 to 6 Lanes
Infrastructure
Post-Bid
$52,363,934 CJ est. value
Orange, TX 77630

Street Repairs for Gary Street, Franklin Street and Professional Drive
Infrastructure
Results
$161,135 est. value
Bridge City, TX 77611

Orange County Advanced Power Station / Entergy TX
New Construction, Infrastructure
Pending Verification
$1,800,000,000 CJ est. value
Bridge City, TX 77611

Dollar General / Vidor
New Construction, Infrastructure - 10,640 SF
Design
$475,000 CJ est. value
Vidor, TX 77662

Sabine River Authority Gulf Coast Canal - SH 87 Crossing Replacement
Infrastructure
Post-Bid
$1,214,000 CJ est. value
Orange, TX 77632

Last Updated 12/05/2022 03:08 PM
Project Title

FM 3247 - Surfacing / Roadway Restoration

Physical Address View project details and contacts
City, State (County) Orange, TX 77632   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,103,499 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Ps&e Package Questions Call: David Collins 8350 Eastex Freeway Beaumont, Tx 77708 409/898-5836 Length: 1.29 Mi Time for Completion: 26 Working Days For Questions Regarding a Proposal Call 512/416-2498 Limits From: Bu 90y, South Limits to: Eom TXDOT - FM 3247 - Surfacing / Roadway Restoration

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents