Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Construct Wall
Infrastructure
Design
$10,125,000 est. value
CA

Construct Soldier Pile Wall, Rdwy Exc, and HMA (Type A)
Infrastructure
Bidding
$3,520,000 CJ est. value
Willits, CA 95490

Construct Soldier Pile Wall, Rdwy Exc, and HMA (Type A)
Infrastructure
Bidding
$3,520,000 CJ est. value
Willits, CA 95490

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Ground Anchor, Roadway Excavation and Timber Lagging
Infrastructure
Results
$19,700,000 est. value
CA

Replace Culverts
Infrastructure
Results
$530,000 est. value
Mendocino, CA

Widen Shoulders
Infrastructure
Design
$1,639,000 est. value
Fort Bragg, CA 95488

Clara Avenue Reconstruction Project
Infrastructure
Bidding
$3,363,163 CJ est. value
Ukiah, CA 95482

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Culvert replacement
Infrastructure
Results
$480,000 est. value
Laytonville, CA 95454

Bridge Replacement
New Construction, Infrastructure
Design
$5,103,000 est. value
Fort Bragg, CA 95488

Trench Work at the UVCC
Infrastructure
Bidding
$300,000 CJ est. value
Ukiah, CA 95482

Drainage Improvements in Imperial County
Term Contract
Post-Bid
$300,000 est. value

Last Updated 07/28/2022 07:33 PM
Project Title

Mendocino County Community Water Supply Replacement Project - Summers Lane Pond Access Road Maintenance

Physical Address View project details and contacts
City, State (County) Fort Bragg, CA 95437   (Mendocino County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $91,500 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DOT PROJECT NO: DROUGHT 21 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Summers Lane, north of Brush Creek Road, will require aggregate base rock application the width of the road to and around the City of Fort Bragg Storage Pond (as shown above) for water transport trucks access. Mobilization (inc. cooperation with City of Fort Bragg) Traffic Control System Prepare Water Pollution Control Program Develop Water Supply Class 2 Aggregate Base Project Location: Storage Pond 19701 Summers Lane, Fort Bragg

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents