Similar Projects
Culvert Replacements
Infrastructure
Bidding
$3,600,000 est. value
New Castle, North Castle, North Salem, Yorktown, NY

Regional Drainage and Culvert Cleaning (Statewide)
Term Contract, Infrastructure
Bidding

Dows Lane Culvert Replacement Project
Infrastructure
Post-Bid
Irvington, NY 10533

Webster Avenue Drainage Project, Phase II
Infrastructure
Post-Bid
New Rochelle, NY 10805

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Webster Avenue Drainage Improvements - Washington Avenue to Lockwood Avenue
Results
New Rochelle, NY 10801

Beechwood Avenue and 2nd Street Drainage Improvements
Infrastructure
Bidding
New Rochelle, NY 10801

Phase V Construction of Open Space Recreation Area - 178 Warburton at the Ridgeway Infrastructure Improvements
Results
Yonkers, NY 10701

Glover Field Culvert Replacement Project
Results
Pelham, Pelham Manor, NY 10803

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Roadway Rehabilitation and Drainage Improvements - Tuttle Road
Results
Briarcliff Manor, NY

Catch Basin Repairs Sawmill River Parkway
Results
Less than $1,300,000 est. value
Greenburgh, Mount Pleasant, New Castle, NY

Ductile Iron Pipe
Results
Yonkers, NY

Culvert Job Order Contract: NYSDOT Region 8
Results
$1,200,000 est. value

Reconstruction of Drainage Systems on Plymouth Road - 2021
Results
NY

Reported 02/25/2022 04:15 PM
Project Title

2021 Fairway Drainage Project

Physical Address View project details and contacts
City, State (County) Rye, NY 10580   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Installation of Fairway Slit Drainage on Holes 7 & 16 Per the Diagrams and Quantities (SF) Provided by Rye Golf Club. Estimated 20,100 Sf of Area to Drain. Drainage to Be Installed on 10’ Spacing. 1) The removal and disposal of existing asphalt, granite curbing (salvage), walk bridges, (salvage), rock debris, and select trees 2) The addition, expansion and/or rebuilding of tees on Holes 4, 5, 6 3) The expansion of greens on Hole 6 (existing 4) and alternate option for Hole 3 3) The rerouting and reconstruction of the fairways on Holes 4, 5, 6 4) The construction of bunkering on Holes 4, 5, 6 5) The transfer of existing fairway sod and all restoration with new sod for Holes 4, 5, 6 6) The installation of fairway slit drainage, block curbing, asphalt cart paths, rock outcroppings and other misc finishing work on Holes 4, 5, 6 7) Owner’s responsibilities: Irrigation installation, new bridge installation, erosion control installation

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents