Similar Projects
Walthall Schools Renovation Projects
Renovation
Conception
Tylertown, MS

N. A. Sandifer Bridge Maintenance
Infrastructure
Design
$615,136 CJ est. value
Monticello, MS 39654

Choctaw County Schools: Football Stadium
Infrastructure
Design
$70,000 CJ est. value
Ackerman, MS 39735

Overlay approximately 12 miles of SR 28 from SR 33 to 2.4 miles east of Dennis Cross Road
Infrastructure
Bidding
$5,000,000 CJ est. value
Harriston, MS 39069

Mill and Overlay of US 82
Infrastructure
Bidding
$10,000,000 CJ est. value
Eupora, MS 39744

Phase II - Field Fencing and Site Utilities for West Lauderdale Youth Association Ballfields
Post-Bid
Collinsville, MS

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

Sykes Elementary School Renovations
Renovation
Results
Jackson, MS 39212

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

New Construction and Renovation for the Brookhaven School District
New Construction, Renovation, Addition - 6,399 SF
Construction
$4,000,000 to $5,000,000 est. value
Brookhaven, MS 39601

Regents School Of Oxford
New Construction
Pending Verification
Oxford, MS

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

Repairs And Renovations: Coahoma County School District Lyon, Jonestown, Friars Point Elementary Schools
Renovation
Design
$6,129,000 CJ est. value
Clarksdale, MS 38614

New Animal Shelter
New Construction, Infrastructure
Bidding
$1,400,000 CJ est. value
Vicksburg, MS 39180

Renovations to Wells APAC Elementary School
New Construction, Renovation - 24,701 SF
Post-Bid
$1,500,000 est. value
Jackson, MS 39202

Last Updated 09/14/2022 03:32 PM
Project Title

New Elementary School

Physical Address View project details and contacts
City, State (County) De Kalb, MS 39328   (Kemper County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $17,508,900 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 8, 2022, the project has not yet been awarded. A timeline for award not yet been established. NOTE: This project will use funds from the Elementary and Secondary School Emergency Relief (ESSER) Fund. Electronic bids are not required but are an option. BID PREPARATION: Bid preparation will be in accordance with Section 00 21 13 Instructions to Bidders, bound in the Project Manual. BID GUARANTEE: Proposals shall be submitted with Proposal Security in the form of Certified Check or acceptable Bid Bond in an amount equal to at least five percent (5%) of the base bid; such security is to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal. The Bid Bond, if used, shall be payable to the Owner. Bonds on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project. Bids must be firm for a period of forty-five (45) days after the scheduled time of opening. PERFORMANCE-PAYMENT BOND: A one hundred percent (100%) Performance-Payment Bond issued by a surety company authorized to do business in the State of Mississippi will be required within ten (10) days after the successful bidder has been notified of the award of the contract to him. CERTIFICATE OF RESPONSIBILITY: All bids submitted by a prime or subcontractor for public works or public projects where said bid is in excess of fifty thousand dollars ($50,000.00) to perform contracts enumerated in Section 31-3-21, Mississippi Code of 1972, shall contain on the outside or exterior of the envelope or container of such bid the contractors current certificate number. No bid shall be opened or considered unless such contractors current certificate number appears on the outside or exterior of said envelope or container or unless there appears a statement on the outside or exte- rior of such envelope or container to the effect that the bid enclosed therewith does not exceed fifty thousand dollars ($50,000.00). NOTE: When bids are submitted electronically, the requirement for including on the exterior of the bid envelope the contractors current certificate of responsibility number or a statement that the bid en- closed does not exceed fifty thousand dollars ($50,000.00) shall be deemed fulfilled and the bid in compliance by including the same information as an attachment with the electronic bid submittal. The Owner reserves the right to reject any or all bids and to waive irregularities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents