Similar Projects
Add/Repair Base Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Shaw Air Force Base, SC 29152

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Bidding
SC

Old Garners Ferry Road Improvements
Bidding
Columbia, SC 29209

FP On-Call CPP Full Depth Patching
Term Contract
Post-Bid
SC

State Street Resurfacing FY 19/20
Post-Bid
Sumter, SC 29151

Interstate 26 Widening MM 85-101
Results

Interstate 26 Widening MM 85-101
Results

Safety Improvements I-20 District1
Bidding

Wildewood Subdivision Paving
Post-Bid
SC

Paving of Industrial Road/High Street - CTC 2019
Results
Sumter, SC 29150

Manning Road Fire Station Driveway Replacement
Bidding
Sumter, SC 29150

Grier Street Road Improvements
Post-Bid
Sumter, SC 29150

North Springs and Harrington Intersection Improvement
Results
Less than $960,931 est. value
Columbia, SC 29204

County Line Trail Roadway Improvements
Bidding
$500,000 to $749,999 est. value
Columbia, SC

Asphalt and Concrete Repair and Restoration (IDC)
Post-Bid
$179,681 est. value
Columbia, SC

Last Updated 10/14/2020 07:35 AM
Project Title

Preservation - District 1

Physical Address View project details and contacts
City, State (County) (Kershaw, Lee, Lexington, Richland, Sumter Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 2,725.000 Sy Maintenance Stone 64.600 Ton Liquid Asphalt Binder Pg64-22 0.630 Ton Full Depth Asph. Pav. Patching 6" Unif. 6,460.000 Sy Clean And Seal Cracks In Asphalt Pavement 51.720 Lami Hot Mix Asphalt Surface Course Type d 10.000 Ton 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 26,130.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 30.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 26,130.000 Lf Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 407.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 270.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 87,960.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 445.000 Lf 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 1,540.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 95,330.000 Lf Detectable Warning Material 1,362.500 Sf Pedestrian Ramp Construction 2,725.000 Sy

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents