Similar Projects
Install 20K Gallon Fuel Oil Tank, Reconfigure Containment System, Remove 4 Fuel Tanks at Mohawk CF
Infrastructure
Bidding
$50,000 to $1,000,000 est. value
Rome, NY 13440

Chemical Bulk Storage Upgrades
Infrastructure
Bidding
East Meadow, NY 11554

Maintenance, Repair and Inspection of Petroleum Product Tanks, Pumps and Other Related Equipment
Post-Bid
Poughkeepsie, NY 12601

Acid and Water Waste Tank Pumping
Post-Bid
South Glens Falls, NY 12803

Underground Fuel Tank Replacement
Results
Schenectady, NY 12305

Oil Tank Electronic Monitoring Systems and Oil Tank Repair Service, Maintenance and Repair
Term Contract
Results
White Plains, NY 10603

Kenmore Mercy Hospital - Fuel Tank-Generator Replacement
Construction
Kenmore, NY 14217

Fuel Tanks Replacement
Infrastructure
Bidding
Depew, Lancaster, NY 14086

Niagara Falls ARS
Post-Bid
$10,000,000 to $25,000,000 est. value
Niagara Falls, NY

Capital Improvement Project Phase 1 - District Wide Gas and Electric Infrastructure Upgrades
Results
Ithaca, NY 14850

SUNY Adirondack - Underground Petroleum Storage Tank Removal
Infrastructure
Bidding
Queensbury, NY

Diesel Fuel System Replacement
Post-Bid
Lowville, NY 13367

Removal and Closure of Underground PBS Tank and Installation of Above Ground PBS Tank
Results
Canandaigua, NY 14424

H--Option - Tank Leak Detection
Post-Bid
Fort Drum, NY 13602

Z1DA--528A5-19-505 Fuel Line and Tank Replacement
Results
$1,000,000 to $5,000,000 est. value
Bath, NY

Reported 09/25/2021 12:00 AM
Project Title

Fuel Oil Tank Restoration at Martin Luther King Jr. Academy

Physical Address View project details and contacts
City, State (County) Yonkers, NY 10701   (Westchester County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work is to restore the existing fuel tank in place. This includes welding all seams as indicated and additional work as specified to restore tank to full function.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents