Similar Projects
Charter Match Science Lab Upgrade Path of Travel
Renovation
Bidding
$1,000,000 CJ est. value
New York, NY 10007

Charter Match Science Lab Upgrade Path of Travel
Renovation
Bidding
$1,000,000 CJ est. value
New York, NY 10007

Friends Seminary Skyspace
Renovation - 1,580 SF
Post-Bid
New York, NY 10003

Ethical Culture Fieldston School Phase II
Renovation - 10,000 SF
Post-Bid
New York, NY 10023

PS112M - Reso Multimedia Center
Renovation
Results
$250,000 est. value
New York, NY

PS112M - Reso Multimedia Center
Renovation
Results
$250,000 est. value
New York, NY

OS000X - 3K Center
Renovation
Construction
$10,424,919 CJ est. value
New York, NY 10007

OS000X - 3K Center
Renovation
Construction
$10,424,919 CJ est. value
New York, NY 10007

Varick Street Mixed Use Tower
LEED Certification, New Construction, Infrastructure - 340,800 SF
Pending Verification
$408,000,000 CJ est. value
New York, NY 10013

Loyola School Building Project
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$14,050,000 CJ est. value
New York, NY 10028

Auditorium Upgrade/Path of Travel
Renovation
Bidding
$1,000,000 CJ est. value
New York, NY 10007

PS241M - Exterior Masonry/Parapets/Doors
Renovation
Post-Bid
$6,553,125 CJ est. value
New York, NY 10026

JS057K - Reso Auditorium Upgrade
Renovation
Results
$250,001 to $500,000 est. value
New York, NY

WHIN Music Community Charter School
Addition, Renovation, Infrastructure
Pending Verification
$11,240,000 CJ est. value
New York, NY 10032

PS040M - Ext Masonry, Windows, Parapets, Roofs, Flood Elim
Renovation
Bidding
$4,000,000 CJ est. value
New York, NY 10003

Last Updated 06/15/2023 08:14 PM
Project Title

Fire Alarm System/Ventilation

Physical Address View project details and contacts
City, State (County) New York, NY 10128   (New York County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $7,893,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Only Contractors that are prequalified with the SCA are eligible to submit bids for this project Performance Period: 730 Continuous Calendar Days Design No.: D020819 The High School for Climate Justice/IS655 (Manhattan) SCA system-generated category: (not to be interpreted as a "bid range") $3,000,001 to $10,000,000 A "Wicks" subcontractor is defined as a subcontractor performing construction work in the HVAC, Plumbing & Gas Fitting or Electrical Trades and (except for HVAC) licensed to do business in the CITY OF NEW YORK in that trade All questions by prospective bidders concerning this solicitation should be directed, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date to Mr. Vish Persaud, at E-mail: vpersaud@nycsca.org, Phone Number: (718) 752-5935. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. ARCHITECTURAL: 1. Repair boiler room floor and provide new finish flooring. Repoint interior masonry wall. Patch plaster at ceiling 2. Remove and replace plaster ceiling on first floor. 3. Remove window pane at existing bathroom on 1st floor through 4th floor and install new metal panel with cutout for new duct opening. 4. Remove metal cover at existing supply and return vents and install new grill on 1st floor through 4th floor. 5. Cut exist. Roofing assembly and exist. Concrete slab required for new exhaust fan at roof. Repair roofing assembly. Mechanical: 1. Remove two out of service H&V units, including their steam engine fan drives and associated local ductwork and steam and condensate piping. 2. Remove ductwork throughout the building as indicated on the drawings. 3. Provide two new replacement H&V units and associated local ductwork and steam and condensate piping. 4. Provide ductwork throughout the building as indicated on the drawings. 5. Clean all existing and new ductwork per SCA specification 15992, new work cleaning and testing. 6. Provide exhaust fans and toilet exhaust fans on the roof and in the building as indicated on the drawings. 7. Provide startup, testing and balancing of all new equipment. 8. Provide all other work shown on drawings and specifications. Electrical: 1. Provide required power supply to HVAC equipment, complete with cable, conduits and panelboards. 2. Furnish and install roof mounted power receptacles. 3. Disconnect, temporarily remove and reinstall lighting fixtures in the Basement and First Floor due to removal of existing ducts and installation of new ducts. Provide new lighting fixtures where required. 4. Temporarily remove existing low voltage systems in the cellar and first floor affected by the installation of new ducts, including the rerouting of associated cable and conduits. Contractor shall provide new cable and additional conduit as required. Fire alarm: 1. Remove existing fire alarm system, including fire alarm devices, wiring and conduits. 2. Furnish and install new fire alarm system, including fire alarm devices, wiring and conduits. 3. Provide required connections to the HVAC units. 4. Furnish and install new fire alarm fused cut-out panel and disconnect switch to power the fire alarm system, complete with cable and conduit. 5. Provide testing and connection to the FDNY. The project is located at 320 East 96th Street, New York, NY 10128 (the "Site").

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents