Similar Projects
Last Updated | 07/18/2022 11:26 PM |
Project Title | Chinook Gravel Trail Removal and Installation |
Physical Address | View project details and contacts |
City, State (County) | Portland, OR (Multnomah County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition, Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of existing trail: . Removal of existing damaged asphalt trail section. . Removal will consist of removal and disposal of duff and top organic layers down to mineral soil and backfill should be applied in 6 inch lifts and compacted until no visual displacement. . Complete any root trimming necessary in the area and install root barrier to reduce future root encroachment. Installation of new trail section will be consistent with option 1 in attached drawings that include: . Raised timber side rails that are secured with re-bar that are 1/2 '' thickness x 18'' minimum depth. . Timbers for this should be 6''x6'' pressure treated lumber or an approved alternative with a 6 foot tread width. . Base layer material should be a minimum of a 4'' layer of 3/4 '' minus gravel topped with a 2'' compacted 1/4 '' minus gravel with fines . . Outslope should be 2% minimum 3% maximum. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |