Similar Projects
Wallowa Whitman/Umatilla National Forests Mechanical and Hand Thinning BPA
Term Contract
Design
Baker City, Pendleton, OR 97814

Wallowa Whitman/Umatilla National Forests Mechanical and Hand Thinning BPA
Term Contract
Design
Baker City, Pendleton, OR 97814

Seasonal Removal and Installation of Monofill Cover at North Marion Transfer Station
Infrastructure
Bidding
Woodburn, OR 97071

Carter Building Pre-demolition Hazardous Materials Abatement and Disposal Project
Infrastructure, Alteration
Bidding
$5,904,922 est. value
Springfield, OR 97477

Hamilton Walton Residence Hall Transformation Project - Phase 2
Demolition
Sub-Bidding
$792,000 est. value
Eugene, OR 97408

Snow Removal Services
Term Contract, Infrastructure
Post-Bid
Ontario, OR 97914

Storm Tree and Vegetative Debris Removal Services
Infrastructure
Post-Bid
OR

Refuse & Recycling Services for Bonneville Lock and Dam
Term Contract
Results
Cascade Locks, OR 97014

Englewood School Brownfield
Demolition
Results
Coos Bay, OR

USDA Forest Service Wildland Fire On-Site Incident Recycling Services
Term Contract
Design
McClellan, Redding, Riverside, CA - Lakewood, CO - Missoula, MT - Albuquerque, NM - Portland, OR - Salt Lake City, UT

Snow Removal Services for Residential Streets
Infrastructure
Bidding
Bend, OR

Snow and Ice Control
Infrastructure
Post-Bid
Redmond, OR

Demolition of Cruise In Diner South West River Road
Demolition
Results
$150,000 est. value
Hillsboro, OR 97123

Snow Removal Services For Residential Streets
Term Contract
Post-Bid
Bend, OR 97703

Sale of Recovered Timber
Infrastructure
Results
Gates, OR 97346

Last Updated 07/18/2022 11:26 PM
Project Title

Chinook Gravel Trail Removal and Installation

Physical Address View project details and contacts
City, State (County) Portland, OR   (Multnomah County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing trail: . Removal of existing damaged asphalt trail section. . Removal will consist of removal and disposal of duff and top organic layers down to mineral soil and backfill should be applied in 6 inch lifts and compacted until no visual displacement. . Complete any root trimming necessary in the area and install root barrier to reduce future root encroachment. Installation of new trail section will be consistent with option 1 in attached drawings that include: . Raised timber side rails that are secured with re-bar that are 1/2 '' thickness x 18'' minimum depth. . Timbers for this should be 6''x6'' pressure treated lumber or an approved alternative with a 6 foot tread width. . Base layer material should be a minimum of a 4'' layer of 3/4 '' minus gravel topped with a 2'' compacted 1/4 '' minus gravel with fines . . Outslope should be 2% minimum 3% maximum.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents