Similar Projects
Minnesota Medal of Honor Memorial - Mechanical
Bidding
$558,000 est. value
Saint Paul, MN

Boiler Maintenance and Repairs
Bidding
Minneapolis, MN

OWEF - Boilers Comprehensive Ultrasonic Thickness Testing
Term Contract
Post-Bid
Rochester, MN 55904

Nicollet Public Schools Mechanical Equipment - Supply
Post-Bid
Mankato, MN

JFK Elementary School 2021 Mechanical Upgrades
Results
Lakeville, MN 55044

2021 Mechanical Upgrades
Results
Lakeville, MN 55044

MnDOT Northfield Truck Station Campus - Electrical and Mechanical
Bidding
$4,674,000 est. value
Northfield, MN 55057

Chiller Maintenance
Post-Bid
Minneapolis, MN

Owatonna 2021 Multi-site Mechanical Upgrades
Results
$900,000 est. value
Owatonna, MN 55060

MnDOT HRTC Mech Sys Maint, Test, Repairs
Term Contract
Post-Bid
Shoreview, MN 55126

Valley View Elementary School Boiler Plant
Results
Columbia Heights, MN 55421

Chiller and Boiler Water Chemical Treatment Services
Post-Bid
Minneapolis, MN

Repair Buildings 1 and 2 at MVH - Electrical and Mechanical
Results
Less than $230,000 est. value
Hastings, MN 55033

Boiler Repair Services
Post-Bid
Saint Paul, MN 55106

Wentworth Library Boiler Replacements
Results
West Saint Paul, MN 55118

Last Updated 12/21/2020 09:14 AM
Project Title

Steam Boiler Replacement at MCF Red Wing

Physical Address View project details and contacts
City, State (County) Red Wing, MN 55066   (Goodhue County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,963,759
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition of four existing low pressure boilers and associated piping, flues, and controls. 2. Demolition of the existing #2 fuel oil pumps and associated controls. 3. Installation of four new dual fuel low pressure steam boilers and flues within the existing building. 4. Installation of a new directed fired make-up air unit. 5. Modification of the existing steam, feed water, natural gas, fuel oil, and electrical system to support the new equipment. 6. Epoxy coating of selected floor areas within the boiler room. 7. Installation of a new steel catwalk to provide service access to the new equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents