Similar Projects
Range Concrete Work
Infrastructure
Design
$80,000 CJ est. value
Boulder Junction, WI 54512

Range Concrete Work
Infrastructure
Design
$80,000 CJ est. value
Boulder Junction, WI 54512

Grosser Lane TRID/LRIP Project
Infrastructure
Bidding
$405,000 CJ est. value
Phelps, WI 54554

Grosser Lane TRID/LRIP Project
Infrastructure
Bidding
$405,000 CJ est. value
Phelps, WI 54554

Snow Plowing
Term Contract
Post-Bid
Eagle River, Land O' Lakes, Saint Germain, WI 54540

Forest Street Landing Seawall
Infrastructure
Post-Bid
Eagle River, WI 54521

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Chip Seal Double Coat / Hot Mix Asphalt / Culvert Replacement
Results
Presque Isle, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tamarack Road
Infrastructure
Bidding
$40,000 CJ est. value
Conover, WI 54519

Blacktop Work of Hall Road and Schuman Road
Infrastructure
Post-Bid
$376,000 est. value
Woodruff, WI 54568

Minocqua - Manitowish, Trout River Culvert Replacement
Infrastructure
Results
WI

Star Lake Road to Replace a Culvert
Infrastructure
Post-Bid
$400,000 est. value
WI

Monico - Eagle River
Infrastructure
Results
WI

Last Updated 11/30/2022 05:07 AM
Project Title

CTH K - CTH B, CTH K to N. Flowage Lake Road

Physical Address View project details and contacts
City, State (County) Conover, WI 54519   (Vilas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,870,149 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

CTH K - CTH B, CTH K to N. Flowage Lake Road; Vilas County; 9513-00-70, WISC 2023 052; CTH S; 3.283 Miles; Grading, Base, Pulverize and Relay, Asphalt Pavement, Culvert Pipe, Signs, and Pavement Markings Contract Completion Time: 65 Working Days Estimated Range $2,000,000 - $2,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 049 - CTH K - CTH B, CTH K to N. Flowage Lake Road *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents