Similar Projects
Elyson Left Turn Lanes (Phase 1) Asphalt Paving, Culverts, and Roadside Ditches
Infrastructure
Bidding
$980,000 CJ est. value
Houston, TX 77009

Construction of Drainage & Paving Facilities
Infrastructure
Bidding
$250,000 CJ est. value
Bellaire, TX 77401

Construction of Parkland Village Section 46 - LS Improvements, Recreational Facilities
Alteration
Post-Bid
TX

2022 Annual Sidewalk Improvements Phase II
Term Contract
Post-Bid
Pasadena, TX 77506

Formal - CSB - Annual Concrete Replacement at Turning Basin Terminal 2021-2022
Term Contract
Results
$1,503,925 est. value
Houston, TX

District Wide Concrete Services
Alteration
Results
Houston, TX

Clearing and Grubbing for Plow Tract Phase I
Infrastructure
Bidding
$300,000 CJ est. value
Katy, TX 77493

Type B and Type D Hot- Mix Hot Laid Asphaltic Concrete Material and Related Items for Harris County Precinct 3
Term Contract
Post-Bid
Houston, TX 77020

Concrete Joint Cleaning Replacement and Related Items for Various Locations Precinct 1
Alteration
Results
TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Sienna Section 64
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Katy, TX 77493

Ready Mix Concrete U - Cart and Curbside Cement
Term Contract
Results
Pasadena, TX

Construct 12 Acre Expansion of an Interim Container Storage Facility for the Redevelopment of the West End of Barbours Cut Terminal
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Houston, TX 77002

IH0010 - Full Depth Concrete Repair and Bridge Deck Repair
New Construction, Infrastructure, Alteration
Results
$1,582,750 est. value
TX

Construction of Hardscape Improvements for The Highlands Sundew Park
Infrastructure
Post-Bid
$400,000 CJ est. value
Highlands, TX 77562

SH0249 - Full Depth Concrete Repair
Alteration
Results
$1,474,987 est. value
TX

Last Updated 04/10/2023 06:06 AM
Project Title

Park at Palm Center Landscape Project Phase 2A

Physical Address View project details and contacts
City, State (County) Houston, TX 77021   (Harris County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $920,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all necessary materials, equipment, superintendence, labor, and incidentals for the Construction of Additional Park Upgrades and Improvements at Park at Palm Center. The right is reserved, as the interest of the Owner may require, to reject any and all bids, and to waive any informality in bids received. The deadline to ask questions is 3/28/2023 12:00 PM CST project No. ARBN1800214.00 Request for Bid Information, to Project Manager upon finding errors, discrepancies, or omissions in Bid Documents. The Work shall consist of, but shall not be limited to, the following Work items: a) Coordinate with utility owners and governing agencies. b) Project Costs (bonding, insurance, general conditions, mobilization, and miscellaneous costs) c) Provide and maintain required traffic control devices. d) General Site Work incl., but not limited to excavation, fine/rough grading, sand, topsoil complete and in place. e) Apply for and procure all applicable permits from the applicable governing agencies. f) Comply with tree protection requirements in Specification Section 01562 - Tree and Plant Protection. Provide protection to existing trees, landscaping, and irrigation systems. g) Work of the contract is for the demolition of existing wood structures at proposed restrooms location; construction of approximately 60 linear feet of 6-inch PVC sanitary sewer, 140 linear feet of 2-inch PVC water line including valves, fittings, connections and appurtenances, and approximately 250 linear feet of HDPE storm sewer and associated inlets and manhole; installation of reinforced concrete foundations for the new two (2) restrooms, west entry, and northwest entry; installation of a small wood framed structure as shown on the construction drawings. Project Manual and/or instructed by the City Engineer and for construction of the service lines. The work also includes site and pavement restoration, tree protection, storm water pollution prevention and traffic control in relation to the construction of the water line, storm sewer, and sanitary sewer. h) The Scope of Work is defined by the Contract Documents and consists of the new construction of two restrooms. Contractor shall furnish all labor, materials, tools, equipment and incidentals necessary to perform the Work including selective demolition. Detailed requirements and extent of Work is stated in the applicable Specification Sections and shown on the Drawings. i) Northwest Entry Sign, shall include all items incidental for a complete in place installation, including, but not limited to: all materials, footings, excavation, artist coordination, lighting, conduits, and inspections. j) West Entry Sign, shall include all items incidental for a complete in place installation, including, but not limited to: all materials, footings, excavation, artist coordination, lighting, conduits, and inspections. k) Existing shade canopy frame and shade fabric replacement, shall include all items incidental for a complete in place installation, including, but not limited to: shop drawings, material samples, etc. l) Splashpad Repainting, shall include all items incidental for a complete in place installation, including, but not limited to: coordination with artist, surface prep and cleaning, paint, adjacent surface protection as detailed in drawings, repair and clean as needed from painting activities, and sealant.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents