Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

11Th Street Apartments
New Construction
Design
Mebane, NC

Rosehill Road Sidewalk Plan NCDOT Project U-5528Fa
Infrastructure
Bidding
Fayetteville, NC

Northern Regional Park Multiuse Path
Infrastructure
Bidding
Wilmington, NC

MUP and Sidewalk Improvements Old Fayetteville Road/Village Road/Town Hall Drive
Post-Bid
Leland, NC 28451

Campus Parking Lot Crack Filling, Sealcoat and Restriping
Post-Bid
Goldsboro, NC 27534

Bike, Sidewalk and Pedestrian Improvements
Results
Less than $1,090,168 est. value
Cary, NC 27513

Street Maintenance Concrete Repair 2020
Results
Less than $1,412,029 est. value
Durham, NC 27701

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Entrance and Surface Parking Improvements
Construction
Hendersonville, NC 28791

EB-6032 Hope Mills Road/NC-59 Sidewalk
Infrastructure
Bidding
Fayetteville, NC 28312

NCWRC Washington Baum Bridge Baa Parking Lot Paving Project
Post-Bid
Kitty Hawk, NC

Horne Street Improvements/Town Hall Parking Lot Expansion
Results
Less than $621,227 est. value
Clayton, NC 27520

Caswell County Campus - ADA Compliance Upgrades
Infrastructure
Bidding
Roxboro, NC

Demolition and Reconstruction of Public Walkway
Demolition
Post-Bid
Emerald Isle, NC

Last Updated 03/31/2022 03:02 PM
Project Title

CDBG Melrose-Chandler-Apple Street Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Burlington, NC 27217   (Alamance County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes approximately 1850 LF of sidewalk (including crossings). The project starts at intersection of Apple Street and Hampton Drive; the sidewalk runs with Apple Street, Chandler Avenue, and Melrose Drive. The project terminates at existing sidewalk near intersection of Melrose Drive and Sharp Road.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents