Similar Projects
Buck Rake Boulevard Improvements
Infrastructure
Bidding
$300,000 est. value
Platteville, CO 80651

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2022 Colorado Boulevard Mill and Overlay
Infrastructure
Post-Bid
Frederick, CO 80530

Hidden Valley Parkway Extension
Results
$1,000,000 to $1,500,000 est. value
Severance, CO 80546

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Mead Public Works Maintenance Facility
New Construction - 12,000 SF
Construction
Mead, CO 80542

2022 Pavement Maintenance Program
Infrastructure
Post-Bid
Frederick, CO

Centerplace Turn Lane Improvements Phase II
Results
Greeley, CO 80634

2022 Seal Project - Pavement Maintenance Program
Infrastructure
Post-Bid
Frederick, CO

US85 Weld County
Results
$5,000,000 to $20,000,000 est. value
CO

South Front Street Construction
Infrastructure
Post-Bid
Platteville, CO 80651

Resurfacing
Results
$1,000,000 to $5,000,000 est. value
CO

CO Omad 300(67) Minuteman Missile Access Roads
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Grover, CO

Kahil Reconstruction Project
Results
$1,404,292 est. value
Fort Lupton, CO 80621

FY23 Asphalt Maintenance
Infrastructure
Post-Bid
Greeley, CO 80639

Last Updated 06/24/2022 03:56 AM
Project Title

2022 Street Maintenance Program

Physical Address View project details and contacts
City, State (County) Erie, CO 80516   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Application of a 1.5" mill & overlay of Erie Parkway (east and west bound) - (County Line Road east to Briggs Street) - approximately 13,100 SY. All areas on Erie Parkway will require repair of premarked subgrade failures, profile milling, following the milling the surface will be inspected for cracking and addressed as needed, valves and manholes will be adjusted and all pavement marking replaced. Complete reconstruction of the following Erie AirPark roads per specifications included. Roads will require valve adjustments. Commander Drive - approximately 8,630 SY Bellanca Court - approximately 2,955 SY Mooney Place - approximately 2,829 SY Piper Drive - approximately 9,979 SY Cherokee Court - approximately 3,935 SY Skylane Drive - approximately 1,149 SY Viking Court - approximately 2,236 SY

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents