Similar Projects
Hiawatha National Forest Toilets
Demolition
Design
Gladstone, MI

New Elementary Technology Systems - Bid Package 2
Renovation
Bidding
$300,000 CJ est. value
Schoolcraft, MI 49087

M-99 Full Depth Concrete Repair
Post-Bid
MI

Fabric Membrane Structure
New Construction
Post-Bid
MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Concrete Materials for Camp Grayling MTC
Results
Grayling, MI

Mechanically Stabilized Earth Wall Repair and Concrete Beam Repair From High Load Hit Including Crack Injection and Carbon Fiber Wrap on I-196
Infrastructure
Construction
$209,810 CJ est. value
Wyoming, MI 49519

Kent Lake Dam Concrete Repairs
Alteration
Post-Bid
$100,000 est. value
Huron Beach, MI

Concrete Leveling At Civic Center Pool
Results
Southfield, MI 48076

Patio Construction
Alteration
Post-Bid
Holland, MI 49423

2021 City Street Sectioning
Results
$650,000 est. value
Riverview, MI

M66 Concrete Repairs
Alteration
Post-Bid
MI

Concrete Patches, Us-12 Between Lotz to Heywood Pavt Repair
Alteration
Results
Taylor, MI

Concrete Foundation for Fabric Membrane Structure
Alteration
Post-Bid
Jackson, MI

Papp Park Pavilion Concrete Replacement
Alteration
Results
Taylor, MI 48180

Last Updated 12/13/2022 03:20 PM
Project Title

Roof Replacement at Richfield ELC and PSA Campuses

Physical Address View project details and contacts
City, State (County) Flint, MI 48502   (Genesee County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Your firm is invited to submit an offer to Owner for roof replacement at the Richfield Early Learning Center, located at 4358 Richfield Rd, Flint MI 48506, and the Richfield Public School Academy, located at 3807 N. Center Rd, Flint MI 48506 Project description: Work includes roofing replacement and HVAC work at both locations and new wood mechanical platforms at Richfield Public School Academy.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents