Similar Projects
Last Updated | 02/04/2020 10:47 AM |
Project Title | New Applied Technologies Building and Newton Building Renovation |
Physical Address | View project details and contacts |
City, State (County) | Durham, NC (Durham County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | |
Project Status | Construction Commenced September 2019, Construction Completion Expected June 2021 |
Bids Due | View project details and contacts |
Estimated Value | $18,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Packages: BP 01A - General Trades, BP 01B - Final cleaning, BP 02A - Surveying, BP 03A - Building Concrete, BP 04A - Turnkey Masonry, BP 05A - Structural & Misc. Steel, BP 06A - Casework/Interior Architectural Woodwork, BP 07C - Roofing/Metal Wall Panels, BP 07D - Caulk, Sealants, Fluid-Applied Air Barrier, BP 08A - Glazing, BP 08C - Door and Hardware, BP 09A - Metal Studs & Drywall, BP 09B - Hard Tile, BP 09C - Acoustical Ceilings, BP 09D - Resilient Flooring/Carpet, BP 09F - Polished Concrete, BP 09G - Painting, BP 10A - Specialties, BP 10C - Signage, BP 12A - Window Treatments, BP 14A - Elevator, BP 21A - Fire Suppression, BP 22A - Plumbing, BP 23A - HVAC Mechanical (incl. Test & Balance), BP 23B - Plumbing & HVAC Mechanical (incl. Test & Balance) Combo, BP 26A - Electrical, Data, Fire Alarm, Security, AV, BP 31A - Turnkey Site with Earthwork, Utilities, Site Concrete, Site Furnishings, BP 32A - Fencing, BP 32B - Landscaping. Project Description: The Applied Technologies Building building is a new 40,000 sf building located at Durham Technical Community College (DTCC) main campus. Building construction consists of a new 2 story structural steel frame, faced with brick, metal panels and curtain wall systems. Includes laboratory space, classrooms and administrative offices. Also, includes site work package and landscaping. The Newton Building Renovation is a 50,000 sf existing building located across the street from the Applied Tech building on Durham Technical Community College (DTCC) main campus. This building is to be renovated over the course of two summers starting in 2020 and 2021. This renovation will include demolition of existing finishes, installation of new front facade, finishes, fire alarm system, fire sprinkler system, and miscellaneous PME systems upgrades. Scope Includes: General Trades, Final Cleaning, Surveying, Landscaping, Site Utilities, Grading, Asphalt Paving, Site & Building Concrete, CMU Masonry, Brick Veneer, Structural Steel, Misc Steel, Membrane Roofing, Metal Wall Panels, Doors & Hardware, Aluminum Curtainwalls and Windows, Metal Studs and Drywall, Hard Tile, Acoustical Ceilings, Resilient Flooring & Carpet, Painting, Interior Signage, Whiteboards/Tackboards, Toilet Partitions and Accessories, Fire Extinguishers and Cabinets, Canopies, Projection Screens, Roller Shades, Casework, Elevator, Plumbing, Fire Suppression, HVAC Mechanical, Electrical, Fire Alarm, and Security |
||||||||||||||||||||||||||||||||||||||
Details | ,, 90,000 SF - 1 College/University, 2 Stories Above Grade, 40,000 SF New Construction Building, 1 College/University, 50,000 SF Renovation Building.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |