Similar Projects
Water Reclamation Facility Bio-solids Building Envelope Improvements
Renovation
Bidding
$1,260,897 CJ est. value
Dayton, OH 45402

Plumbers for Replacement of Lead Service Lines on Public and Private Property - Child Care Grant
Term Contract
Bidding
$330,000 est. value
Cincinnati, OH

Plumbing Services
Alteration
Post-Bid
Cleveland, OH

Cellulose Insulation, Construction Materials, And Residential Electrical, Plumbing And Heating Related Services
Term Contract
Post-Bid

Plumbing Services Repair and Maintenance
Results
Cleveland, OH

Wright Point II Backflow Preventer
Results
Dayton, OH 45431

Hamilton County - Portune Center Basement Concrete Beam and Deck Repairs
Infrastructure
Bidding
$123,000 CJ est. value
Cincinnati, OH 45202

T&M Contract Plumbing - HVAC - Refrigeration
Term Contract, Alteration
Post-Bid
Akron, OH

Hot Water Tank Replacement
Results
Dayton, OH 45402

Collection System Repairs Phase II
Infrastructure
Bidding
$1,123,500 CJ est. value
Canton, OH 44702

CSC-21501 Maintenance of HVAC, Plumbing and Emergency Power Supply (EPS) Systems
Term Contract
Post-Bid
Whitehall, OH 43213

Plumbing Bid
Results
Caldwell, OH

Sanitary Sewer Reconstruction 2021 Large Diameter Lining
Infrastructure
Bidding
$6,172,336 CJ est. value
Akron, OH 44308

Plumbing Maintenance and Repair Services for Campus
Alteration
Post-Bid
Cincinnati, OH

HCWP - Expansion Joint - R. Miller
Results
Columbus, OH

Last Updated 09/27/2022 12:03 AM
Project Title

Lower Northside Interceptor Lining

Physical Address View project details and contacts
City, State (County) Akron, OH 44308   (Summit County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $5,521,200 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 09/19/2022 at 11:00 AM ET Online Portal Engineers Estimate: $5,521,200 EPA Goals: 1.3% MBE and 1.0% WBE City of Akron Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% WBE) The project is to line the sewer from Rack 33 near Main Street to the sewer crossing at the Little Cuyahoga River. This is needed to maintain the structural integrity of the pipe as well as to reinforce the pipe in anticipation of the additional loading from the sediment deposition from the Gorge Dam Removal project. The work will be completed by installing cured in place (CIPP) lining and constructing point repairs.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents