Similar Projects
Last Updated | 04/24/2023 09:42 AM |
Project Title | Morey Avenue School Outdoor Learning Shade |
Physical Address | View project details and contacts |
City, State (County) | Sacramento, CA 95838 (Sacramento County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $317,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project scope includes but is not limited to preparation of site to receive (1) 30' x 64' metal shade structure. Fabrication and delivery of the shadeac structure is by the manufacturer. The site contractor is responsible for the assembly/installation of the shade structure, preparation of the site; including foundations, site paving, associated site work, (2) pre-engineered aluminum ramp/landing (CFCI) and (1) drinking fountain, along with work as shown in the project documents for a complete and operational project. Work to be performed during normal business hours. Each Bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure section 995.120, made payable to the District in the form set forth in the Bid Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid, as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required performance and payment Bonds, insurance certificates and any other required documents. Within 10 days after notification of the Award of Contract, the successful bidder or bidders will be required to furnish, simultaneously with execution of the Contract, a Labor and Material Payment Bond and a Faithful Performance Bond in the form required by the District, each in an amount equal to one hundred percent (100%) of the Contract Price. The Contract Documents for the Project have many unique requirements. Bidders are cautioned to carefully review all of the Contract Documents prior to submitting a Bid and to obtain pre-Bid clarification of any provision which bidder believes is ambiguous or confusing, as provided for in the Contract Documents. Questions regarding bidding procedures may be directed to the contacts listed above. Questions regarding bid specifications and site work should be directed to the following by March 06, 2023 @ 2:15 pm |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |