Similar Projects
Emerson Avenue Improvements
Design
$27,631,381 est. value
Indianapolis, IN 46204

Concrete Pavement Rehabilitation - Area 1
Bidding
$2,000,000 to $3,000,000 est. value
Indianapolis, IN 46204

Amtrak - Maintenance Yard Paving
Infrastructure
Bidding
Beech Grove, IN 46107

Term Agreement for On-Call Pothole Patching Services Department of Public Works
Term Contract
Post-Bid
Indianapolis, IN

Horse Track Surface Conversion
Post-Bid
Indianapolis, IN

Knollton Road Over Crooked Creek
Results
$750,000 to $1,300,000 est. value
Indianapolis, IN 46204

Chatham Arch Alley Reconstruction
Results
$150,000 to $250,000 est. value
Indianapolis, IN 46204

Intersection Improvement and ITS Traffic Management Systems
Infrastructure
Bidding
IN

Amy Beverland Elementary School New Bus Drive
Post-Bid
Indianapolis, IN 46236

Parking Garage Trench Drains and Misc Concrete Repairs
Results
Indianapolis, IN 46241

Riverside Park Promenade Trail
Infrastructure
Bidding
$3,000,000 to $5,000,000 est. value
Indianapolis, IN 46208

Asphalt Paving and Site Improvements
Post-Bid
Indianapolis, IN 46214

Delaware Street Structural Rehabilitation from Maryland Street to Vermont Street
Results
$3,000,000 to $5,000,000 est. value
Indianapolis, IN 46204

Miscellaneous Pavement Repairs
Post-Bid
$2,500,000 est. value
Indianapolis, IN

Intersection Improvement with Added Turn Lanes
Results
IN

Reported 03/11/2022 12:00 AM
Project Title

Red Line 2022 HMA and PCCP Maintenance Project

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46213   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project limits are along the Red Line route from University of Indianapolis to 66th & College Avenue. s for HMA full depth patching work within the Capitol Avenue, College Avenue, and Meridian Street corridors of the Red Line Bus Rapid Transit (BRT) Line. Concrete bus pads along the Red Line station platforms will be removed and replaced, and rub rail will be installed at each Red Line station

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents