Similar Projects
Liberty Estates Mixed Use
New Construction
Conception
$120,000,000 est. value
Merrillville, IN 46410

Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Bid Package #2 - Additions and Renovations to Bibich Elementary - Building Package
Addition, Demolition, Renovation, Infrastructure
Design
$9,434,204 CJ est. value
Dyer, IN 46311

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Removal and Installation of Bus Shelters Services
Infrastructure
Bidding
$300,000 CJ est. value
Gary, IN 46402

Removal and Installation of Bus Shelters Services
Infrastructure
Bidding
$300,000 CJ est. value
Gary, IN 46402

Crown Point High School - Athletic Fields and Site Improvements
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Crown Point, IN 46307

Crown Point High School - Athletic Fields and Site Improvements
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Crown Point, IN 46307

2021 ADA Sidewalk Ramp
Post-Bid
$42,150 est. value
Winfield, IN

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Stationhouse and East Parking Lot - Double Track Project 3
New Construction
Results
Gary, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Boys & Girls Club
New Construction - 15,000 SF
Pending Verification
Merrillville, IN 46410

Centerpoint BioFuels Plant
New Construction, Infrastructure
Pending Verification
$600,000,000 CJ est. value
Gary, IN 46406

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 CJ est. value
Crown Point, IN 46307

Last Updated 09/03/2022 07:19 AM
Project Title

Central Park, Phase 2

Physical Address View project details and contacts
City, State (County) Griffith, IN 46319   (Lake County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Park/Playground, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work for which proposals are to be received is for construction of design improvements of Central Park. Improvements include: existing pavilion improvements, new storage building, new patio space, ADA accessible ramp, concrete and paver path, ornamental fencing with brick columns, earthwork, drainage improvements, electrical expansions, and site lighting. Bids shall be properly and completely executed on Bid Forms and in the order as identified and contained in the Contract Documents obtainable from the offices as stated above. Each bid shall be accompanied by a completely filled out Form No. 96 (latest revision) and acceptable Bid Security. Any bid not accompanied by the above-required items shall be deemed to be a non-responsive bid.Three (3) hard copies and one (1) digital copy in pdf format of all required bid documents shall be submitted. No Bidder may withdraw his proposal within a period of 60 days following the date set for the receiving of bids. The Owner reserves the right to retain any and all bids for a period of not more than 60 days and said bid shall remain in full force and effect during said time. The Owner further reserves the right to waive informalities and to award the Contract to any Bidder all to the advantage of the Town of Griffith or to reject all bids. BID SECURITY: Each bid shall be accompanied by an acceptable certified check made payable to the Town of Griffith or an acceptable bid bond in the amount equal to 10% of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the current Treasury Department Circular 570. BONDS: A Performance Bond and Payment Bond each in the amount of 100% of the Contract price will be required from the Contractor to whom the work is awarded. INDIANA REQUIREMENTS: Standard Questionnaire Form 96 (latest revision), completely filled out and signed, including attachment of Contractor's Financial Statement as stipulated in Section

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents