Similar Projects
Davis Street Sanitary Sewer Replacement - City of Allegan
Infrastructure
Conception
$263,000 CJ est. value
Allegan, MI 49010

Knapp and Academy Water Main Road - 97900 - City of Allegan
Infrastructure
Conception
$520,300 CJ est. value
Allegan, MI 49010

1121 Electric Avenue Warehouse and Office
New Construction, Infrastructure - 17,774 SF
Design
$3,000,000 CJ est. value
Wayland, MI 49348

Allegan Public Schools - Allegan Elementary School - Bid Package 2
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Allegan, MI 49010

Courthouse Statue Relocation
Infrastructure
Bidding
$220,000 CJ est. value
Allegan, MI 49010

Wiley Road Water Special Assessment District No. 1
Infrastructure
Bidding
$748,000 CJ est. value
Saugatuck Township, MI 49408

Hamilton Community Schools - Hamilton Elementary Addition and Remodel
Addition, Demolition, Build-out, Infrastructure
Sub-Bidding
$7,500,000 CJ est. value
Hamilton, MI 49419

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Stillwater Multi-Residential
New Construction, Infrastructure - 32,000 SF
Post-Bid
$5,000,000 CJ est. value
Pullman, MI 49450

Paving Service
Infrastructure
Results
Allegan, MI 49010

Bridge Street Improvements
Alteration
Results
$206,330 est. value
Saugatuck, MI 49453

Harvest Meadows Phase II Condominiums
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Leighton Township, MI 49348

Fastool Building Addition
Addition, Demolition, Infrastructure - 7,100 SF
Pending Verification
$1,000,000 CJ est. value
Wayland, MI 49348

Lake Drive and Arnold Water Main and Road - 97900 W - City of Allegan
Infrastructure
Conception
$442,200 CJ est. value
Allegan, MI 49010

Construction Services - Courthouse Addition and County Services Building/Courthouse Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$8,000,000 CJ est. value
Allegan, MI 49010

Last Updated 10/12/2023 03:01 AM
Project Title

Hot Mix Asphalt and Concrete Shared-Use Path, Earthwork and Restoration Along the Blue Star Highway

Physical Address View project details and contacts
City, State (County) Fennville, MI 49408   (Allegan County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,125,098 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

0.85 mi of hot mix asphalt and concrete shared-use path, earthwork and restoration along the Blue Star Highway from the MDOT Park and Ride to Shangrai La Drive, Allegan County. This is a Local Agency project. Net classification required for this project is 1035 Fa or Comb/Jt. 1035 Cb, Ea or Comb/Jt. 1035 Cb, J or Comb/Jt. 1035 Ea, J In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea, Fa and J. If the prime contractor is not prequalified in those sub classifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No CM 03000 206346A 23A0492 MI DOT - 2310 022 - Hot Mix Asphalt and Concrete Shared-Use Path, Earthwork and Restoration Along the Blue Star Highway

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents